Mahaveer v. State of Maharashtra and Anr
- Citation
- 2025 INSC 1206; [2025] 10 S.C.R. 381
- Court
- Supreme Court of India
- Bench
- 2 Judges: Justice Sanjay Karol, Justice Prashant Kumar Mishra
- Decided
- 8 Oct 2025
- Case number
- CRIMINAL APPEAL No. 2154/2011
- Sections
- 39, 44, 313, 248(1), 452, 50, 26, 24, 378
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:21 am. Original source ↗
Preview: first 50% of the document.
[2025] 10 S.C.R. 381 : 2025 INSC 1206 Mahaveer v.
State of Maharashtra and Anr.
(Criminal Appeal No(s). 2154-2155 of 2011)
08 October 2025 [Sanjay Karol* and Prashant Kumar Mishra, JJ.] Issue for Consideration Issue arose whether the acquittal of the appellant-director of the company was correctly reversed by the High Court and whether his conviction u/ss.39 and 44 of the Electricity Act, 1910 for committing theft of energy and for interference with meters or licensee’s works, and for improper use of energy, sustainable.
Headnotes† Electricity Act, 1910 – ss.39 and 44 – Theft of energy – Penalty for interference with meters or licensee’s works, and for improper use of energy – Conviction of the appellant-director of the company for the offence punishable u/ss.39 and 44, for committing theft of energy and for interference with meters or licensee’s works, and for improper use of energy by the High Court, reversing the findings of acquittal recorded by the Magistrate – Sustainability:
Held: Under s.39, for the presumption against the consumer to take effect, it must be proved that an artificial means or a means not authorised by the licensee had been used in committing the theft – Presumption is not of automatic application, and instead, something is required to be established for it to apply, thus, on facts, it must be established by the MSEB that an artificial means had been employed – None of the five witnesses deposed with complete confidence about the alleged theft of electricity and the use of artificial means therein, by the appellant – Most of the testimonies based on estimation, presumption, approximation or possibilities, which cannot be deemed to be sufficient for proving the theft – As a necessary follow-up of the inability of the prosecution to prove the use of artificial means, the presumption against the * Author 382 [2025] 10 S.C.R.Supreme Court Reports consumer, that is, the appellant, not set in motion – Charge u/s.44 is resting on shaky grounds as well – Nothing on record to show that the meter had been injured or tampered with – None of the investigators from the MSEB carried out a practical exercise of checking the holes and the wires, and the possibility of it being actually used for theft, as alleged to have taken place – None of the witnesses or any other third person saw the accused, or, for that matter, any other person connected to the Company, openly tampering with the box – No categorical statement that at the time of installation or any time prior to the inspection of the meter box by officials of the MSEB, there were no holes in the box – There are too many open possibilities for criminal liability to be affixed to any person – s.44 also has not been proved beyond a reasonable doubt – Thus, neither ss.39 nor 44 could be established against the appellant – Judgment and order passed by the High Court set aside. [Paras 13-17] Case Law Cited Ramesh Babulal Doshi v. State of Gujarat [1996] Supp. 2 SCR 265 : (1996) 9 SCC 225; Satya Narain Prasad v. Bhagwan Ramdas (1995) Supp. 4 SCC 629; Kalamani Tex v. P. Balasubramanian [2021] 1 SCR 668 : (2021) 5 SCC 283; Vadivelu Thevar v. State of Madras [1957] 1 SCR 981 : 1957 SCC OnLine SC 13 – referred to. List of Acts Electricity Act, 1910.
List of Keywords Theft of energy; Interference with meters or licensee’s works; Improper use of energy; Presumption; Use of artificial means; Holes in the box; Criminal liability.
Case Arising From CRIMINAL APPELLATE JURISDICTION: Criminal Appeal No(s). 2154-2155 of 2011 From the Judgment and Order dated 15.10.2010 of the High Court of Judicature at Bombay at Aurangabad in CRLA Nos. 270 and 346 of 1997 [2025] 10 S.C.R. 383Mahaveer v. State of Maharashtra and Anr. Appearances for Parties Advs. for the Appellant:
Sunil J. Mathews, Deepak Kore, Ms. Jyoti Rani Chib, Ms. Yashika, Rajeev Singh.
Advs. for the Respondents:
Ajit Bhasme, Sr. Adv., Shrirang B. Varma, Siddharth Dharmadhikari, Aaditya Aniruddha Pande, Sanjay Kumar Visen, Rohan K Santoshi, Parth Sarathi, Prashant Sharma, Gyanendra Vikram Singh, Ms. Soumya Gulati.
Judgment / Order of the Supreme Court Judgment Sanjay Karol, J.
1. These appeals, at the instance of the appellant-convict, are directed against the judgment and order dated 15th October, 2010, passed in Criminal Appeal No.270/1997 and Criminal Revision Application No.346/1997, whereby a learned Single Judge of the High Court of Judicature at Bombay (Bench at Aurangabad) overturned the findings of acquittal recorded by the IIIrd Jt. Judicial Magistrate (FC) at Jalan in Reg. Criminal Case No.108/93 for the offence punishable under Sections 39 and 44 of the Indian Electricity Act, 19101 .
2. The facts as have been laid out by the Courts below are as follows:- 2.1 The appellant-convict was a Director of M/s. Rushi Steels and Alloys Pvt. Ltd. 2 , situated at Plot No.52/7 of MIDC Area, Jalan and was responsible for conducting the business of the Company. The power supply to the Company was provided by the Maharashtra State Electricity Board 3 .
2.2 The officials of the MSEB, in March 1993, noticed a mismatch between the units supplied to these factories vis-à-vis the readings taken from the meters at these factories. The alleged disparity was to the extent of 36.6 per cent. Naturally, an 1 Hereinafter referred to as “The Act”
2 Hereinafter referred to as the “Company”
3 Hereinafter referred to as “MSEB”
384 [2025] 10 S.C.R.Supreme Court Reports investigation was followed in the months of April and May 1993. During inspection of the meters placed at the factory of the appellant-convict by senior officials of MSEB, in the presence of independent witnesses, it was found that the meter had been tampered with, and the box in which it was placed had 3 holes of 4 mm each.
2.3 According to the prosecution, the officials of the MSEB concluded that the workers of the Company had been using additional wires, interfering with the meter supply and thereby causing a slowdown in the running of the meter. As such, the holes were sealed. On a subsequent reading of the meter, the disparity was now found to be around 10 per cent.
2.4 The approximate quantification of the alleged theft of electricity was to the tune of Rs.30 lakhs.
2.5 The Executive Engineer, MSEB, lodged a First Information Report with the Taluka Jalan Police Station, on 25 th June 1993. Upon completion of the investigation, a chargesheet was filed before the Court on 1st October 1993.
3. The prosecution examined five witnesses. Statement under Section 313 Code of Criminal Procedure 4 of the two accused, namely Radheshyam and Mahaveer, the present appellant-convict (Mahaveer), was also recorded. It may be noted here itself that the appeal qua Radheshyam stood dismissed as abated vide order dated 30 th September 2019. The defence did not lead any other evidence and furnished a whole and complete denial of the accusations levelled by the prosecution.
4. The Trial Court, on consideration of the entire evidence, concluded that the prosecution had failed to establish its case beyond a reasonable doubt. It could not prove abstraction, dishonest use or consumption of electrical energy. The charges under Sections 39 and 44 of the Act could not be established and as such, the following order was passed:- "1. Both the accused viz., (1) Radheshyam S/o Ratanlal Agrawal, age 40 years and 2) Mahaveer S/o Ratanlal 4 Hereinafter referred to as “Cr.PC”
[2025] 10 S.C.R. 385Mahaveer v. State of Maharashtra and Anr. Agrawal, age 55 years, Directors of M/s. Rushi Steel and Alloys Pvt. Ltd. Company are hereby acquitted of the punishable offence under Section 39 of the Indian Electricity Act, 1910.
2. Both the accused are further acquitted of punishable offence U/sec. 44 of the Indian Electricity Act, 1910.
3. Both accused are acquitted under the provisions of Section 248(1) of Cr. P.C.
4. Bail bonds of both accused stand cancelled.
5. Both the accused be set at liberty forthwith.
6. Muddemal viz., meter box in question be delivered to prosecution vide Exh. 122, application of prosecution claiming meter box in question U/sec. 452 Cr.P.C.
subject to condition that prosecution shall execute a bond to restore it to the court if order made under Sub Section (1) of Sec. 452 Cr.P.C. is modified or set aside an appeal or revision.”
(S.D. Agrawal)
3rd Jt. Judicial Magistrate (F.C.) Jalna Date : 25.4.1997”
5. On appeal, the High Court framed the following points for consideration:- “i) Whether the prosecution proves that the respondents committed theft of energy?
ii) Whether the prosecution proves that the respondents interfered with the electric meter?
iii) Whether the complaint is made by competent person as expected under Section 50 of the Electricity Act?
iv) What is the scope of appreciation of evidence when the appeal against acquittal is filed?”
6. On consideration of evidence, the High Court held that once the extra holes in the meter box were sealed, the consumption increased significantly, and since the possibility of any other user stealing the 386 [2025] 10 S.C.R.Supreme Court Reports electricity had been foreclosed by the holes being plugged with a metal plate having been placed there, it stood proved that the appellantconvict(s) was responsible for the theft. Regarding Section 44 of the Act, it was concluded that the case would fall squarely under clause ‘c’ of the said Section. Further, it was observed that the appellantconvict(s) did not make any attempt to prove that the extra holes in the meter box were not caused by them. Regarding the issue that PW-3 Dinkar, being the competent authority to lodge the complaint, it was held that he was given that he had been deputed by the MSEB as the officer responsible for that area. Accordingly, a complaint at his instance would be treated as a complaint made on behalf of MSEB, and so, it would be in accordance with the law. On the next point, it was held by the learned Single Judge that the Trial Court had not appreciated the law as laid down by this Court in Ramesh Babulal Doshi v. State of Gujarat5 . Having recorded as above, the appeal and the revision were allowed, and the appellant-convict(s) was sentenced to suffer rigorous imprisonment for a period of one year and to pay a fine of Rs.2 lakhs each, in default whereof the appellant-convict(s) was to undergo further rigorous imprisonment for a period of 3 months.
7. Hence, these appeals. We have heard learned counsel appearing for the parties.
8. The short question to be considered is whether the acquittal of the appellant-convict(s) was correctly reversed by the High Court and whether the conviction so handed down to him is sustainable in law.
9. The two provisions, of which infraction is alleged on the part of the appellant-convict(s), are reproduced below for ready reference: – Section 39 [39. Theft of energy.—Whoever dishonestly abstracts, consumes or uses any energy shall be punishable with imprisonment for a term which may extend to three years, or with fine which shall not be less than one thousand rupees, or with both; and if it is proved that any artificial means or means not authorised by the licensee exist for the abstraction, consumption or use of energy by the
5 (1996) 9 SCC 225
[2025] 10 S.C.R. 387Mahaveer v. State of Maharashtra and Anr. consumer, it shall be presumed, until the contrary is proved, that any abstraction, consumption or use of energy has been dishonestly caused by such consumer.] Section 44
44. Penalty for interference with meters or licensee’s works, and for improper use of energy.—Whoever—
(a) connects any meter referred to in Section 26, sub-section (1), or any meter, indicator or apparatus referred to in Section 26, sub-section (7), with any electric supply-line through which energy is supplied by a licensee, or disconnects the same from any such electric supply-line, 1 [* * *]; or 2 [(aa) unauthorisedly re-connects any meter referred to in sub-section (1) of Section 26, or any meter, indicator or apparatus referred to in sub-section (7) of Section 26, with any electric supply-line or other works, being the property of the licensee, through which energy may be supplied, when the said electric supply line or other works has or have been cut or disconnected under sub-section (1) of Section 24; or]
(b) lays, or causes to be laid, or connects up any works for the purpose of communicating with any other works belonging to a licensee, 3 [* * *]; or
(c) maliciously injures any meter referred to in Section 26, sub-section (1), or any meter, indicator or apparatus referred to in Section 26, sub-section (7), or wilfully or fraudulently alters the index of any such meter, indicator or apparatus, or prevents any such meter, indicator or apparatus from duly registering; or
(d) improperly uses the energy of a licensee;
Continue reading
Sign in and become a member to continue reading this judgment and every other document in the library.
Members read the full text, download where permitted, and keep notes and bookmarks.