Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:19 am. Original source ↗
Preview: first 50% of the document.
[2025] 7 S.C.R. 14 : 2025 INSC 731 Gopal Dikshit v.
United India Insurance Company Ltd.
(Civil Appeal No. 6623 of 2025)
19 May 2025 [B.V. Nagarathna and Satish Chandra Sharma,* JJ.] Issue for Consideration Matter pertains to the correctness of the order passed by the National Commission dismissing complaint filed by appellant; and whether the cause of loss to the premises is due to the seepage water or the heavy rains in Delhi.
Headnotes† Consumer Protection Act, 1986 – s.23 – House holder insurance policy – Second survey report – Reliability – Premises of the appellant insured with respondent-insurance company – Due to heavy downpour in Delhi, his premises severely flooded, resulted in extensive damage to the basement and the belongings lying there – First survey carried out, which stated that cause of loss was heavy rain – However, the second survey carried out since the report of first survey was not satisfactory – Appellant also sought opinion of two structural engineers – Respondent repudiated the claim of the appellant on the ground that damage to the building was caused by continuous seepage of water from the basement, which was not listed as a named peril under the insurance policy, thus, the resulting loss or damage not indemnifiable – National Commission dismissed the appellant’s complaint – Correctness:
Held: In view of the concurrent findings in the certificates and first survey report, the damage to the insured premises was not caused by any inherent structural defect or seepage, but was instead a direct consequence of unprecedented and heavy rainfall experienced during the relevant period, which led to flooding of water into the basement – First survey, conducted promptly, had already comprehensively assessed the cause and extent of the * Author [2025] 7 S.C.R. 15Gopal Dikshit v. United India Insurance Company Ltd. damage – Nothing on record to suggest that first survey was deficient or incomplete in any manner – Despite conducting a survey before, respondent proceeded to commission a second survey without furnishing any reasonable, cogent, or valid grounds justifying the necessity for a reassessment – Second survey report deviated from the reasons of the first survey report and curiously recorded that the damage to the premises was caused by seepage, rather than by flooding due to heavy downpour – Second survey report failed to counter or address the detailed and comprehensive observations made in the first survey report nor did it offer any explanation or new material facts that would warrant a reversal of the initial conclusion – This abrupt departure from the earlier findings, without explanation or justification, raises serious concerns about the reliability and objectivity of the second survey – In the absence of any substantive grounds to question the findings of the first survey, belated reassessment conducted by respondent is deemed arbitrary and without due basis – No reason to accept the second survey report and it is set aside – Contrary findings of National Commission set aside – Matter remanded back to determine the appropriate quantum of compensation payable to the appellant. [Paras 29-31] Case Law Cited Mahavir Road and Infrastructure Private Limited v. Iffco Tokio General Insurance Company Limited [2019] 5 SCR 890 : (2019) 5 SCC 677 – distinguished.
United India Insurance Co. Ltd. v. Dipendu Ghosh & Anr., II (2009) CPJ 311 (NC) – referred to.
List of Acts Consumer Protection Act, 1986.
List of Keywords Rejection of insurance claim; House holder insurance policy; Severe flood; Basement inundated with water; Survey report; Opinion of structural engineers; Seepage; Inherent structural defect; Direct consequence of unprecedented and heavy rainfall; Abrupt departure from findings of survey report; Arbitrary reassessment by insurance company; National Consumer Disputes Redressal Commission; Cause of loss to the premises due to seepage water 16 [2025] 7 S.C.R.Supreme Court Reports or heavy rains in Delhi; Second survey report; Extensive damage to basement; First survey report; Continuous seepage of water from the basement; Insurance policy; Indemnifiable; Belated reassessment; Compensation.
Case Arising From CIVIL APPELLATE JURISDICTION: Civil Appeal No. 6623 of 2025 From the Judgment and Order dated 07.12.2022 of the National Consumers Disputes Redressal Commission, New Delhi in CC No. 2287 of 2017 Appearances for Parties Advs. for the Appellant:
Sukumar Pattjoshi, Sr. Adv., Siddhartha Chowdhury, Shaffi Mather, Rajesh Kumar.
Advs. for the Respondent:
Amit Kumar Singh, Ms. K Enatoli Sema, Ms. Chubalemla Chang, Prang Newmai.
Judgment / Order of the Supreme Court Judgment Satish Chandra Sharma, J.
1. The present appeal under Section 23 of the Consumer Protection Act, 1986 (hereinafter the “Act”) arises out of the impugned order dated 07.12.2022 passed by the Hon’ble National Consumer Disputes Redressal Commission, New Delhi (hereinafter “NCDRC”) in Consumer Case No. 2287 of 2017 whereby NCDRC dismissed the complaint filed by the Appellant.
FACTUAL MATRIX
2. The complainant who is the Appellant herein is the owner of the premises situated at 50, Ishwar Nagar, Mathura Road, New Delhi, 110065 (hereinafter “Premises”). The Premises had a basement, ground floor, first floor and second floor. The entire building was insured with the opposite party who is the Respondent herein vide [2025] 7 S.C.R. 17Gopal Dikshit v. United India Insurance Company Ltd. House Holder Insurance Policy No. 2219042615P115431073 for Rs. 1.50 crores which was valid for the period from 13.03.2016 to 12.03.2017.
3. It is the case of the Appellant that due to a heavy downpour in New Delhi from 25.08.2016 to 31.08.2016, the Premises were severely flooded. During this period, the Appellant was out of Delhi from 24.08.2016 to 29.08.2016. Upon his return, he found that the basement of the Premises was inundated with water, resulting in extensive damage to the furniture, fittings, almirahs, books, and other belongings stored there. In an effort to prevent further deterioration, the Appellant installed a booster pump on 30.08.2016 to drain out the water from the basement. Despite this measure, the accumulated floodwater could not be completely drained out. Thereafter, the Surveyor, Mr. Akash Chopra, visited the Premises on 03.09.3016 and inspected the basement.
4. On 04.09.2016, the Appellant contacted Ms. Indu Singh by phone to inquire about the outcome of the survey conducted by Mr. Akash Chopra. Ms. Singh informed him that the report prepared by Mr. Chopra was not satisfactory and, therefore, she would assign another Surveyor to revisit the premises and reassess the damage. The Appellant also requested a copy of the preliminary survey report, but the Respondent did not provide it, avoiding the request without offering any explanation.
5. Second Surveyor, Mr. R.K. Singla visited the Appellant’s Premises and conducted the survey again. In the meanwhile, the surveyor who visited the site on 03.09.2016, submitted its report on 06.09.2016 which stated that the cause of loss was due to heavy rain in Delhi on 25.08.2016 and water entered from the flooring, resulting in damages to the insured building and contents.
6. Additionally, on 07.09.2016 the Appellant sought the opinion of two structural engineers concerning the safety of the Premises. The opinion given by both of them indicated that the building was no longer fit for habitation and had become structurally unsafe and concluded that the Premises had to be vacated immediately and recommended that it be demolished and reconstructed.
7. On 10.09.2016, the Complainant once again contacted Ms. Indu Singh to inquire about the status of the survey. She reiterated that 18 [2025] 7 S.C.R.Supreme Court Reports the report was not satisfactory and requested the Appellant to visit her office on 12.09.2016 to clarify certain points. During this meeting, Ms. Indu Singh informed the Complainant that, due to the use of the term “seepage” in the survey reports, the insurance claim would not be admissible. Consequently, the final survey report was submitted on 18.10.2016.
8. Subsequently, on 23.11.2016, the Appellant received a letter from the Respondent formally repudiating the claim. The rejection was based on the ground that the damage to the building was caused by continuous seepage of water from the basement, which was not listed as a named peril under the insurance policy, therefore, the resulting loss or damage was not indemnifiable.
9. Being aggrieved and dissatisfied by the dismissal of the Appellant’s claim, Consumer Case No. 2287 of 2017 was filed before NCDRC. However, the said complaint was dismissed by the NCDRC, which gives rise to the instant appeal.
10. Before delving into the merits of the case, we would like to consider the submissions made by the parties.
SUBMISSIONS MADE BY THE APPELLANT/COMPLAINANT
11. The learned counsel for the petitioner submitted that judgments of NCDRC have consistently held that “flood” means outpouring of water and on this analogy, it would include both inundation and seepage. Reliance was placed on United India Insurance Co. Ltd. v. Dipendu Ghosh & Anr. reported in II (2009) CPJ 311 (NC).
12. Moreover, it was submitted that NCDRC ought to have relied on the Meteorological Department Report stating that Delhi had rainfall during the period of 25.08.2016 to 31.08.2016. It was further submitted that it is a common practice in Delhi that on a particular day certain portions of Delhi received scanty rainfall whereas other pockets received heavy rainfall. In the case of the Appellant, the Ishwar Nagar area received heavy rainfall and as such there was flooding in the area.
13. Furthermore, the Appellant submitted that “seepage” refers to the slow and gradual flow of liquid from a source. In the present case, the basement had accumulated over 3 feet of water within a span of just three days while the Appellant was away from Delhi. The Appellant respectfully contended that such rapid and substantial [2025] 7 S.C.R. 19Gopal Dikshit v. United India Insurance Company Ltd. flooding cannot be classified as “seepage” as seepage does not result in the sudden inundation of a basement with three feet of water.
14. It was further submitted that in case there was seepage water in the basement, the same ought to have attracted the attention of the Appellant earlier and he ought to have taken adequate remedial measures to stop the seepage and not allowed the water to retain in the premises and get his belongings damaged.
15. Moreover, the first surveyor visited the site on 03.09.2016 while the 2nd Surveyor visited the site only on 09.09.2016 i.e. 10 days after the reporting of the incident to the Respondent. It was respectfully submitted that no prudent person would allow the water to stay in the premises for 10 days and further facilitate in destroying his belongings kept in the basement. The NCDRC ought to have relied on the Survey Report dated 06.09.2016 rather than the Survey Report dated 18.10.2016. It may not be out of place to state that once the survey was conducted on 09.09.2016, there was no occasion to submit the report on 18.10.2016 i.e. more than one month after conducting the survey. The same smacks of mala fide intentions on the part of the Respondent.
16. It was further contended that in its Report dated 06.09.2016, the Surveyor specifically states that the cause of loss was: “Due to heavy rains in Delhi on 25.08.2016 the water entered from the flooring, resulted in damages to the insured’s building and contents.” It is submitted that the Survey Report dated 06.09.2016 was never taken into consideration by the Respondent and instead the Respondent opted to go for another survey which was conducted 10 days after the incident occurred.
17. Moreover, the report of the engineer only stated the condition of the building which had nothing to do with the seepage water in the basement. In this behalf it was submitted that the Certificates issued by M/s Unique Consulting Engineers dated 07.09.2016 states that: “Further, existing building was constructed having RCC frame. As time passes structure became old resulting corrosion in reinforcement due to water seepage in structural elements, i.e. reducing the strength of building. Hence, it is strongly recommended to dismantle existing building and reconstruct to meet present seismic parameters of the National Building Code of India; 2009.” 20 [2025] 7 S.C.R.Supreme Court Reports The said report only states the structural condition of the building and further states that there is water seepage in structural elements (not basement) which includes the iron rods etc., which are inserted in the soil. The said report nowhere discusses anything about the condition of the basement of the building. In the respectful submission the NCDRC had wrongly relied on the said Report to reject the legitimate claim of the Appellant.
18. Further, it was submitted that Surveyors appointed by the Respondent had categorically stated in their reports that there was heavy rainfall on 25.08.2016. It was submitted that the basement of the Appellant was perfectly dry when he left on 24.08.2016 but after his return on 29.08.2016 he found that the basement was flooded with water with water marks on the walls up to the window height.
19. It was submitted that it is not in dispute that the basement was flooded with water. The Respondent has denied the claim of the Appellant on the ground of seepage and appointed multiple surveyors, however, not once the Respondent has or their surveyors tried to trace the source of the water, nor appointed anybody to trace the source of water. The Respondent is completely silent about the source of water in the basement. The same is unfair practice on the part of the Respondent.
SUBMISSIONS MADE BY THE RESPONDENTS