Swacch Association, Nagpur v. The State of Maharashtra & Ors.
- Citation
- 2025 INSC 1199; [2025] 10 S.C.R. 531
- Court
- Supreme Court of India
- Bench
- 3 Judges: Justice Bhushan Ramkrishna Gavai, Justice K. Vinod Chandran
- Decided
- 7 Oct 2025
- Case number
- CIVIL APPEAL No. 12521/2025
- Sections
- 25, 3, 23
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:21 am. Original source ↗
Preview: first 50% of the document.
[2025] 10 S.C.R. 531 : 2025 INSC 1199 Swacch Association, Nagpur v.
The State of Maharashtra & Ors.
(Civil Appeal No. 12521 of 2025)
07 October 2025 [B.R. Gavai, CJI, K. Vinod Chandran and N.V. Anjaria,* JJ.] Issue for Consideration Whether the Futala Tank classifies within the meaning and definition of r.2(1)(g) of the Wetlands (Conservation & Management) Rules, 2017; The kind and nature of the constructions in and around the Futala Tank.
Headnotes † Wetlands (Conservation & Management) Rules, 2017 – r.2(1)(g) – ‘Wetland’ – Whether the Futala Tank classifies within the meaning and definition of r.2(1)(g):
Held: Futala Lake is not classifiable within the statutory definition of ‘wetland’ in r.2(1)(g) – The lake is a man-made waterbody constructed for drinking water and for irrigation purpose – The definition excludes human made waterbodies and those constructed inter alia for irrigation purposes, as rightly held by High Court in the impugned judgment– r.4 of the 2017 Rules which provides for the restrictions of activity in the ‘wetland’ would not apply stricto sensu to Futala Tank as the Lake falls outside the statutory definition – High Court gave certain directions including that the respondent shall ensure that the spirit of r.4(2)(vi) of the 2017 Rules will be respected and structure of any permanent nature within the lake would not be undertaken; the activities nearby the Futala Lake does not lead to any damage to the Lake and further that the entire waterbed along with its recreational and beautification structures are kept clean and properly maintained – Applying the restrictions and rigours of r.4 of 2017 Rules and in ensuring its relevance to the waterbodies or wetlands, even if they are not covered within the statutory definition, there is a recognition of precautionary principle and doctrine of public trust, which is a judicial foresight and a salutary approach – Various directions issued by the High * Author 532 [2025] 10 S.C.R.Supreme Court Reports Court in the impugned judgment, are only an extension of such foresighted thought acted up – No error in the judgment of the High Court. [Paras 5.4, 5.5, 5.7, 10] Case Law Cited M.C. Mehta v. Kamal Nath & Ors. [1996] Supp. 10 SCR 12 : (1997) 1 SCC 388; M.K. Balakrishnan v. Union of India [2009] 6 SCR 1178 : Writ Petition (Civil) No. 230 of 2001 – referred to. List of Acts Wetlands (Conservation & Management) Rules, 2017; Wetlands (Conservation and Management) Rules, 2010; Construction and Demolition Waste Management Rules, 2016; Manufacture, Storage and Import of Hazardous Chemical Rules, 1989; Rules for Manufacture, Use, Import, Export and Storage of Hazardous Micro-organisms Genetically engineered organisms or cells, 1989; Hazardous Wastes (Management, Handling and Transboundary Movement) Rules, 2008; E-Waste (Management) Rules, 2016; Wetlands (Conservation and Management) Rules, 2010;
Societies Registration Act, 1860; Bombay Public Trusts Act, 1950; Environment (Protection) Act, 1986.
List of Keywords Rule 2(1)(g) of the Wetlands (Conservation & Management) Rules, 2017; ‘Wetlands’; Futala Lake; Futala Tank; Man-made waterbody; Irrigation purpose; Human made waterbodies; Waterbed; Waterbodies; Precautionary principle; Doctrine of public trust; Permanent nature within the lake.
Case Arising From CIVIL APPELLATE JURISDICTION: Civil Appeal No. 12521 of 2025 From the Judgment and Order dated 30.11.2023 of the High Court of Judicature at Bombay at Nagpur in PIL No. 4 of 2023 Appearances for Parties Advs. for the Appellant:
Gopal Sankaranarayanan, Sr. Adv., Ms. Anindita Mitra, Ms. Trisha Chandran, Ms. Shreya Nair, Satyajit Sarna.
[2025] 10 S.C.R. 533Swacch Association, Nagpur v. The State of Maharashtra & Ors. Advs. for the Respondents:
Tushar Mehta, Solicitor General, Ms. Aishwarya Bhati, A.S.G., Shekhar Naphade, S. K. Mishra, Dama Seshadri Naidu, Ms. Ruchi Kohli, Neeraj Kishan Kaul, Ms. Sonali Jain, Sr. Advs., Siddharth Dharmadhikari, Aaditya Aniruddha Pande, Shrirang B. Varma, Bharat Bagla, Sourav Singh, Aditya Krishna, Adarsh Dubey, Ms. Chitransha Singh Sikarwar, Gagan Sanghi, Ms. Salonee Paranjape, Karan Bishnoi, Mrs. A.s Jamuna, Rameshwar Prasad Goyal, Satyajit A. Desai, Ms. Yogeeta Chaudhary, Abhinav K. Mutyalwar, Siddharth Gautam, Ananya Thapliyal, Sachin Singh, Ms. Anagha S. Desai, Pratik Kumar Singh, Puneet Sharma, Gharote Anurag A, Varad Kilor, Ms. Viddusshi, Rohit Anil Rathi, Ms. Niharika Singh, Yashas Rk, Gurmeet Singh Makker, Ms. Astha Singh, Ms. Shivika Mehra, Adv. Mukesh Verma, Mrs. Vatsala Tripathi, Shashank Singh, Krishna Prakash Dubey, Pawan Kumar Shukla, Milind Modi, Ms. Sonali Jain.
Advs. for the Intervenors:
Neeraj Kishan Kaul, Sr. Adv., Rajat Joseph, Hrishikesh S. Chitaley, Kaustubh D. Kadasne.
Judgment / Order of the Supreme Court Judgment N.V. Anjaria, J.
Leave granted.
1.1 Heard learned Senor Advocate Mr. Gopal Sankaranarayanan for the appellant, learned Solicitor General Mr. Tushar Mehta for respondent Nos.1, 2 and 8, learned Additional Solicitor General Ms. Aishwarya Bhati for respondent Nos.8 and 9, learned Senior Advocate Mr. Shekhar Naphade for respondent No.3, learned Advocate# Mr. S.K. Mishra for respondent No.4, learned Senior Advocate Mr. Dama Seshadri Naidu for respondent No.5, learned Senior Advocate Mr. Rohit Anil Rathi for respondent No.6, learned Senior Advocate Mr. Neeraj Kishan Kaul for the intervenor, along with the respective assisting learned advocates, at length.
2. The appellant-original petitioner addresses challenge to the judgement and order dated 30.11.2023 passed by the Division Bench of the # Ed. Note: “learned Advocate” instead of “learned Senior Advocate” in terms of subsequent corrigendum. 534 [2025] 10 S.C.R.Supreme Court Reports High Court of Bombay 1 , whereby the High Court disposed of the Public Interest Litigation No.4 of 2023 with certain observations and directions, declining to grant prayers made in the petition. 2.1 The petition before the High Court was filed by the appellant- Swacch Association-an organisation registered under the Societies Registration Act, 1860 as also under the Bombay Public Trusts Act, 1950, claiming to be a body engaged in the green practices and for promoting a healthy environment, in which a grievance was raised in respect of certain constructions and recreational activities set up in and around the Futala Lake2 in Nagpur City, Maharashtra. The case put forward by the appellant was that the said Futala Lake was a ‘wetland’ and it ought to be protected for its environmental value and that the constructions which were made thereat were of permanent nature.
2.2 What was prayed was to declare that the installation of Musical Fountain and machinery thereof inside the body of the Futala Lake was illegal and against the public trust principle. It was further prayed to declare that the construction of the Viewer’s Gallery on the bank of the Futala Tank was also illegal. The third prayer was for issuance of direction against respondent No.5-Nagpur Metropolitan Regional Development Authority to remove the Musical Fountain and the related set-up installed inside the body of the Futala Tank and to restore the Tank to its original state.
2.3 The fourth prayer was advanced for directing respondent No.3-Municipal Corporation Nagpur and respondent No.4- Maharashtra Metro Rail Corporation to demolish the viewer’s gallery. Yet another prayer was made to declare that the construction of the Parking Plaza on the land bearing Khasra No.13/3 at Mauje Futala was contrary to the zone shown in the sanctioned development plan for Nagpur. Also, a direction was sought against respondent Nos.3 and 4 to demolish the building which was under construction on the said land.
2.4 Interim prayers were made seeking a restraint order against respondent No.4 from carrying out further construction of the 1 Hereinafter, “High Court”.
2 Hereinafter, “Futala Tank”
[2025] 10 S.C.R. 535Swacch Association, Nagpur v. The State of Maharashtra & Ors. Parking Plaza as also against respondent No.5 from holding of Musical Fountain Show, Laser Show and Multimedia Show at the Futala Tank.
3. The case of the appellant before the High Court and further emphasised before this Court was inter alia that in the guise of beautification and in the name of recreational activities for the people, the respondent authorities had proceeded to construct and erect the Viewer’s Gallery on the bank of the Futala Tank and had installed Musical Fountain in the body of the Tank. It was the grievance of the appellant that the construction of nine storeyed building near the Futala Tank was proposed for parking, food court, etc. and that erected there was a Floating Restaurant, artificial Banyan Tree and a Musical Fountain inside the body of the lake.
3.1 It was contended that the Futala Lake was identified as ‘wetland’ in the map of Wetland Atlas of Maharashtra which was part of National Wetland Atlas. It was further claimed that the Lake is a ‘wetland’ within the meaning of Rule 2(1)(g) of the Wetlands (Conservation & Management) Rules, 2017 3 , therefore the restrictions contained in Rule 4(2)(vi) of the 2017 Rules would apply, more particularly in the present case the prohibition contained in Rule 4(1)(iv) would operate.
3.2 It was stated that in the National Wetland Inventory as carried out by Space Application Centre, Ahmedabad under the project “National Wetland Inventory and Assessment (“NWIA)” funded by the Ministry of Environment, Forest and Climate Change, Government of India, the Futala Tank was mentioned amongst 2,01,503 wetlands in the inventory list. The definition of wetland provided in Rule 2(1)(g) of the 2017 Rules has been wrongly construed by the High Court.
3.3 It was the case of the appellant that not only those prohibitions were given a go-by in creating recreational and beautification projects at the lake site, but the Construction Rules and the norm of minimum Fifteen meters’ distance for any construction from a waterbody were also violated. It was further contended that in the sanctioned development project of Nagpur City, the 3 Hereinafter, “2017 Rules”.
536 [2025] 10 S.C.R.Supreme Court Reports proposed construction between the Futala Tank and eighteen metres road was permissible, however the construction was found to be on the Pali (boundary wall) of the Futala Tank. 3.4 It was next contended that the setting up of artificial Banyan Tree was a permanent construction inside the waterbody which was not only in breach of the prohibitory rules, but also it has a damaging effect to the Lake. It was the case that a waterbody of Futala Tank- a ‘wetland’, was exploited for commercial purposes without caring for adverse ecological effect.
3.5 It was pleaded that under Article 21 of the Constitution, right to life has been given an expanded interpretation by this Court to include the right to clean air, clear water, clean environment, hygienic atmosphere and ecological balance. Article 48-A of the Constitution lays down the duty of the State to protect, safeguard and improve the environment and safeguard forest and wildlife, in addition to Article 51-A (g) of the Constitution which casts a duty on every citizen to protect the natural environment including lakes and rivers.
3.6 The appellant then referred to the principle of public trust enunciated by this Court in M.C. Mehta vs. Kamal Nath & Ors.4 It was submitted that the construction of Viewer’s Gallery on the Futala Tank would change the nature of the waterbody as well as its use, to take away its environmental value. It was submitted that the activities permitted in and around the tank run contrary to the doctrine of public trust.
3.7 It may be mentioned that the High Court by a reasoned order dated 05.07.2023 refused to grant any interim relief to the appellant. The prima facie finding was recorded in the interim order that the Futala Lake does not fall within the purview of Rule 2(1)(g) of the 2017 Rules. However, the High Court observed that since the lake was mentioned as ‘wetland’ in the National Wetland Inventory and Assessment (NWIA), prohibition in Rule 4(2)(vi) of 2017 Rules deserves to be treated as relevant to protect the lake.
4. Respondent No.3-Municipal Corporation Nagpur, respondent No.4- Maharashtra Metro Rail Corporation and respondent No.5- Nagpur
4 (1997) 1 SCC 388
[2025] 10 S.C.R. 537Swacch Association, Nagpur v. The State of Maharashtra & Ors. Metropolitan Regional Development Authority filed their replies and placed materials before this Court also in the present proceedings to refute the case and allegations of the appellant.
5. The following facts which are not disputed, go to show that the competent authorities granted various permissions for the projects and recreational facilities at Futala Lake, which were in accordance with the Rules and the norms.
(a) For Viewer’s Gallery, plans were submitted on 29.08.2019 which were sanctioned by the Municipal Corporation Nagpur on 18.10.2019. The Heritage Committee granted sanction on 29.09.2018 and the revised plan was sanctioned on 15.06.2021, in accordance with which the work was executed.
(b) The Parking Plaza plan was sanctioned by the Town Planning Department, Nagpur Municipal Corporation on 01.09.2022. The Heritage Committee also approved the parking plaza construction. It was thereafter that the Environmental Management Plan and the Dam Stability reports were submitted. The Heritage Committee again sanctioned the proposal on 30.06.2022.
(c) The Floating Stage-cum-Floating Banquet was permitted as per the No Objection Certificate (NOC) received on the different occasions on 07.03.2022, 21.03.2022 and 08.04.2022 from the Public Works Department. Similarly, NOCs were received from Group Captain, Commanding Officer, HQ Maintenance Command (Unit) on 22.09.2022, from District Deputy Commissioner of Animal Husbandry, Nagpur on 28.04.2022, from Assistant Commissioner, Fisheries Department, Nagpur on 23.05.2022, from the authority of the Heritage Conservation Committee, Nagpur on 20.07.2022, from Nagpur Municipal Commissioner, Nagpur on 10.05.2022 and also from the City Police Commissioner, Nagpur on 03.12.2022. Thus, the competent authorities have sanctioned the project.
(d) The artificial Banyan Tree is a part of Multimedia Show for which also admittedly, NOC was obtained from the authorities mentioned above, including the local authority.
(e) In respect of alleged utilization of land bearing Number 13/3 Mauje Futala, the Forest Department through Office of the 538 [2025] 10 S.C.R.Supreme Court Reports Deputy Conservation Officer, Nagpur by communication dated 01.03.2024, stated that the said land was not a forest land. It was occupied by Dr. Panjabrao Deshmukh Agricultural University which used to grow saplings thereon.
(f) The Parking Plaza is not set up in the agricultural zone. It was given out that as per the applicable Regulation, the development of parking plaza upto 0.2 FSI of the gross plot area is permissible and that the competent authority has sanctioned the building plan accordingly in compliance with the norm.
(g) By Notification dated 15.10.2003, the State Government sanctioned the ‘Regulations for conservation of building, artefacts, structures, areas and precincts of historic and cultural significance’. The Futala Tank is mentioned at serial number 132 in the Schedule of these Regulations which is treated as Grade I heritage structure. In that view, the necessary sanction of the Heritage Conservation Committee was obtained before securing the permission for development of Futala Tank and Parking Plaza etc. which was granted by the Heritage Committee after obtaining a compliance report.
5.1 It is to be stated that the abovementioned permissions and No Objection Certificates granted by the competent authorities concerned, for the recreational facilities and beautification project set up at the place of the Lake, have not been challenged by the public interest litigant-appellant at any stage of the proceedings. 5.1.1 The respondents, including respondent No.4 have stated that in order to ensure the protection of ecological balance, compensatory afforestation was carried out in respect of the trees which were required to be removed for executing the directions at certain places. The trees which were removed were compensated by planting other trees at the location given by the Municipal Corporation. It was claimed that the Floating Musical Fountain Show resulted into improvement of quality of water in the Futala Tank and its aquatic life is enhanced. It was further stated that the Viewer’s Gallery and the Parking Plaza are in the dry zone. The Viewer’s Gallery has worked as protection against dumping of waste and encroachment.