Electrosteel Steel Limited (Now M/S Esl Steel Limited) v. Ispat Carrier Private Limited
- Citation
- 2025 INSC 525; [2025] 4 S.C.R. 1373
- Court
- Supreme Court of India
- Bench
- 2 Judges: Justice Abhay S. Oka, Justice Ujjal Bhuyan
- Decided
- 21 Apr 2025
- Case number
- CIVIL APPEAL No. 2896/2024
- Sections
- 47, 34, 31, 7, 31(1), 16, 30, 32, 61(3), 63, 238, 14
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:20 am. Original source ↗
Preview: first 50% of the document.
[2025] 4 S.C.R. 1373 : 2025 INSC 525 Electrosteel Steel Limited (Now M/s ESL Steel Limited)
v.
Ispat Carrier Private Limited (Civil Appeal No. 2896 of 2024)
21 April 2025 [Abhay S. Oka and Ujjal Bhuyan,* JJ.] Issue for Consideration Whether upon approval of the resolution plan by the NCLT, the claim of the respondent being outside the purview of the resolution plan stood extinguished; whether the arbitral award dated 06.07.2018 was capable of being executed.
Headnotes† Code of Civil Procedure, 1908 – s.47 – Arbitration and Conciliation Act, 1996 – s.34 – Insolvency and Bankruptcy Code, 2016 – s.31 – Micro, Small and Medium Enterprises Development Act, 2006 – Respondent filed claim petitions against the appellant before the Facilitation Council under the provisions of MSME Act – On 07.06.2017, arbitral proceedings commenced – On 27.06.2017, financial creditors of appellant invoked s.7 of IBC before the NCLT – NCLT imposed moratorium and an interim resolution professional was appointed – Therefore, arbitral proceedings were kept in abeyance – Respondent filed its claim before the resolution professional – Ultimately resolution plan was approved by NCLT settling all the claims of operational creditors at nil value – No appeal was preferred by the respondent – On lifting of moratorium, Facilitation Council resumed the arbitral proceedings – An award passed on 06.07.2018 against the appellant – Appellant did not challenge the award u/s.34 of the 1996 Act – Respondent instituted execution proceeding – At the stage of execution, appellant filed petition contending that arbitral award was nullity and not executable as claim of respondent was settled at nil – Petition was dismissed and the Executing Court by order dated 03.03.2023 directed to comply with award dated 06.07.2018 – The said order was * Author 1374 [2025] 4 S.C.R.Supreme Court Reports challenged by the appellant by filing writ petition before the High Court, which was dismissed – Correctness:
Held: High Court is correct in answering the issue that a plea of nullity qua an arbitral award can be raised in a proceeding u/s.47 CPC but such a challenge would lie within a very narrow compass – However, objection to execution of an award u/s.47 CPC is not dependent or contingent upon filing a petition u/s.34 of the 1996 Act – High Court was not justified in taking the view that since the appellant did not file a petition u/s.34 of the 1996 Act, therefore, it was precluded from filing an application before the Executing Court to declare the award as void and hence nonexecutable – In so far the other issues framed by the High Court are concerned, it is by now well settled that once a resolution plan is duly approved by the adjudicating authority u/s.31(1), all claims which are not part of the resolution plan shall stand extinguished and no person will be entitled to initiate or continue any proceeding in respect to a claim which is not part of the resolution plan – In so far the resolution plan is concerned, the resolution professional, the committee of creditors and the adjudicating authority noted about the claim lodged by the respondent in the arbitration proceeding – However, the respondent was not included in the top 30 operational creditors whose claims were settled at nil – If the claims of the top 30 operational creditors were settled at nil, it goes without saying that the claim of the respondent could not be placed higher than the said top 30 operational creditors – Moreover, the resolution plan itself provides that all claims covered by any suit, cause of action, arbitration etc. shall be settled at nil – Therefore, it is crystal clear that in so far claim of the respondent is concerned, the same would be treated as nil at par with the claims of the top 30 operational creditors – Claim of the respondent stood extinguished – Therefore, the Facilitation Council did not have the jurisdiction to arbitrate on the said claim – Since the award was passed without jurisdiction, the same could be assailed in a proceeding u/s.47 CPC – The award dated 06.07.2018 is incapable of being executed – Impugned order of the High Court is set aside. [Paras 47, 49, 50, 50.1, 52] Words and Phrases – Lifting of Moratorium – Meaning of: Held: Lifting of the moratorium does not mean that the claim of the respondent would stand revived notwithstanding approval of the resolution plan by the adjudicating authority – Moratorium is intended to ensure that no further demands are raised or adjudicated [2025] 4 S.C.R. 1375Electrosteel Steel Limited (Now M /s ESL Steel Limited) v. Ispat Carrier Private Limited upon during the corporate insolvency resolution process so that the process can be proceeded with and concluded without further complications. [Para 50.1] Insolvency and Bankruptcy Code, 2016 – ss.30, 31, 32, 238 – Finality and binding value of Resolution Plan – Discussed. [Paras 25-33] Case Law Cited Ajay Kumar Radheshyam Goenka v. Tourism Finance Corporation of India Ltd. [2023] 4 SCR 986 : (2023) 10 SCC 545; Essar Steel India Ltd. Committee of Creditors v. Satish Kumar Gupta [2019] 16 SCR 275 : (2020) 8 SCC 531; Ghanshyam Mishra & Sons (P) Ltd. v. Edelweiss Asset Reconstruction Co. Ltd. [2021] 13 SCR 737 : (2021) 9 SCC 657; Ruchi Soya Industries Ltd. v. Union of India (2022) 6 SCC 343; RPS Infrastructure Ltd. v. Mukul Kumar [2023] 12 SCR 150 : (2023) 10 SCC 718; Adani Power Ltd. v. Shapoorji Pallonji & Co. Pvt. Ltd, Civil Appeal No. 1741 of 2023; Sarwan Kumar v. Madam Lal Aggarwal [2003] 1 SCR 918 : (2003) 4 SCC 147; M/s. JSW Steel Ltd. v. Pratishtha Thakur Haritwal, 2025 INSC 401; Vasudev Dhanjibhai Modi v. Rajabhai Abdul Rehman [1971] 1 SCR 66 : (1970) 1 SCC 670 – referred to.
List of Acts Micro, Small and Medium Enterprises Development Act, 2006; Insolvency and Bankruptcy Code, 2016; Arbitration and Conciliation Act, 1996; Civil Procedure Code, 1908; Companies Act, 2013. List of Keywords Section 7 of Insolvency and Bankruptcy Code, 2016; Section 31 of Insolvency and Bankruptcy Code, 2016; Moratorium; Arbitration; Facilitation Council; Arbitral award; Section 47 of CPC; Execution proceedings; Resolution plan; Operational creditors; Claim extinguishment; Jurisdiction; Plea of nullity qua an arbitral award raised in execution proceeding; Lifting of moratorium.
Case Arising From CIVIL APPELLATE JURISDICTION: Civil Appeal No. 2896 of 2024 From the Judgment and Order dated 17.07.2023 of the High Court of Jharkhand at Ranchi in CMP No. 376 of 2023 1376 [2025] 4 S.C.R.Supreme Court Reports Appearances for Parties Advs. for the Appellant:
Gopal Jain, Sr. Adv., Ms. Anusuya Sadhu Sinha, Siddharth Naidu, M/s. KSN & Co.
Advs. for the Respondent:
Rajshekhar Rao, Sr. Adv., Sameer Kumar, Shahrukh Ahmad, Ms. Somi Sharma, Mandeep Baisala.
Judgment / Order of the Supreme Court Judgment Ujjal Bhuyan, J.
This appeal by special leave is directed against the judgment and order dated 17.07.2023 passed by the High Court of Jharkhand at Ranchi in CMP No. 376 of 2023 filed by the appellant.
2. Appellant had filed CMP No. 376 of 2023 before the High Court of Jharkhand at Ranchi (briefly ‘the High Court’ hereinafter) under Article 227 of the Constitution of India assailing the order dated 03.03.2023 passed by the learned Presiding Officer, Commercial Court/District Judge-1, Bokaro in Commercial Execution Case No. 21 of 2022 (Execution Case No. 77 of 2018). It may be mentioned that by the aforesaid order dated 03.03.2023, learned Presiding Officer, Commercial Court/District Judge-1, Bokaro (referred to hereinafter as ‘the Executing Court’) had dismissed the application dated 14.05.2019 filed by the judgment debtor (appellant), further directing the judgment debtor (appellant) to comply with the award dated 06.07.2018 passed by the West Bengal Micro, Small and Medium Facilitation Council, Kolkata within fifteen days of the order.
3. Relevant facts may be briefly noted.
4. On 02.12.2014 and 20.12.2014, respondent filed claim petitions before the West Bengal Micro, Small and Medium Facilitation Council (briefly ‘the Facilitation Council’ hereinafter) for a total principal outstanding amount of Rs. 1,59,09,214.00 which were registered as Case No. 330/2014 and Case No. 331/2014. In Case No. 330/2014, the claim amount was Rs. 1,36,69,981.33, whereas in Case No. 331/2014 the claim amount was Rs. 22,39,233.00, thus the total amount being [2025] 4 S.C.R. 1377Electrosteel Steel Limited (Now M /s ESL Steel Limited) v. Ispat Carrier Private Limited Rs. 1,59,09,214.00. The claims were made under the provisions of the Micro, Small and Medium Enterprises Development Act, 2006 (hereinafter referred to as ‘the MSME Act’).
5. As per the requirement of the MSME Act, conciliation proceedings were initiated but attempt for conciliation failed. Thereafter, the arbitration proceedings were commenced on 07.06.2017.
6. On 27.06.2017, the financial creditors of the appellant invoked Section 7 of the Insolvency and Bankruptcy Code, 2016 (‘IBC’ hereinafter) before the National Company Law Tribunal, Kolkata Bench (NCLT) which was registered as C.P. No.(IB) 361/KB/2017.
7. On 21.07.2017, NCLT imposed moratorium and an interim resolution professional was appointed.
8. On 24.07.2017, the interim resolution professional issued a public announcement calling upon all the creditors to submit their claims before him.
9. In view of the moratorium declared by the NCLT, arbitral proceedings before the Facilitation Council were kept in abeyance.
10. Respondent filed its claim before the resolution professional, who partly admitted the claim of the respondent.
11. On 29.03.2018, a resolution plan was submitted by Vedanta Limited before the NCLT wherein all the claims of operational creditors were settled at nil value.
12. However, claim of the respondent was not included in the resolution plan as approved by the committee of creditors. Ultimately, the resolution plan was approved by NCLT on 17.04.2018 under Section 31 of the IBC on and from which date the moratorium period came to an end.
13. In the order dated 17.04.2018, NCLT declared that the claims of all the operational creditors were settled at nil. No appeal was preferred by the respondent. However, the aforesaid order of the NCLT dated 17.04.2018 was challenged before the National Company Law Appellate Tribunal, New Delhi (NCLAT) in Company Appeal (AT) (Insolvency) No.175 of 2018 by some of the operational creditors. But the same was dismissed on 10.08.2018. Other creditors also approached NCLAT in Company Appeal (AT) (Insolvency) No.265/2018 and in analogous appeals. Specific ground taken was 1378 [2025] 4 S.C.R.Supreme Court Reports that in the resolution plan, the resolution applicant had not taken proper care of the operational creditors. These appeals were also dismissed by the NCLAT vide the order dated 20.08.2018. The matter was carried forward to this Court in Civil Appeal No. 1133 of 2019. However, this Court dismissed the said appeal vide the order dated 27.11.2019.
14. It appears that on lifting of the moratorium, Facilitation Council resumed arbitral proceedings. Appellant did not contest the arbitral proceedings. Ultimately, an award was passed on 06.07.2018. As per the award, the Facilitation Council directed the appellant to pay a sum of Rs.1,59,09,214.00 along with interest to the respondent in terms of Section 16 of the MSME Act.
15. Appellant did not challenge the award dated 06.07.2018 under Section 34 of the Arbitration and Conciliation Act, 1996 (briefly ‘the 1996 Act’ hereinafter).
16. Respondent instituted execution proceeding which was initially registered as Execution Case No.77 of 2018 and thereafter as Commercial Execution Case No.21 of 2022 before the Executing Court. At the stage of execution of the award, appellant filed a petition dated 14.05.2019 contending that the arbitral award was a nullity and hence not executable as the claim of the respondent was already settled at nil as per the resolution plan and, therefore, nothing was payable to the respondent.
17. Executing Court by the order dated 03.03.2023 dismissed the petition of the appellant and directed it to comply with the award dated 06.07.2018 within fifteen days.
18. As noted above, this came to be challenged by the appellant before the High Court by filing a petition under Article 227 of the Constitution of India. High Court framed the following questions for consideration:
a. The arbitral award having not been challenged under Section 34 of the Act of 1996, whether the objection to execution of the arbitral award referrable to Section 47 of the Civil Procedure Code, 1908 (CPC) was maintainable by alleging that the arbitral award itself was a nullity and hence non-executable?
[2025] 4 S.C.R. 1379Electrosteel Steel Limited (Now M /s ESL Steel Limited) v. Ispat Carrier Private Limited b. Whether the arbitral award in the present case could be assailed as a nullity and hence non-executable within the permissible grounds of raising such a plea?
c. Irrespective of maintainability of the objection to the arbitral award under Section 47 of the CPC, whether on facts, the Facilitation Council lost its jurisdiction to proceed and pronounce the arbitral award in view of the insolvency resolution plan of the petitioner which was duly approved under Section 31 of the IBC?
19. Insofar the first question is concerned, High Court opined that the plea of nullity qua an arbitral award can be raised in an execution proceeding under Section 47 of the CPC. However, the scope of interference would be very narrow. As regards the second question, High Court rejected the contention of the appellant that since the award suffered from patent or inherent lack of jurisdiction and therefore was a nullity, it can be questioned at the stage of execution without challenging the award under Section 34 of the 1996 Act. High Court answered the third question by holding that the Facilitation Council did not lose its jurisdiction to procced and pronounce the arbitral award notwithstanding approval of the resolution plan by the NCLT under Section 31 of IBC. Reasoning given by the High Court is that the arbitral proceedings were initiated prior to the insolvency resolution date, kept suspended during the moratorium period and resumed after lifting of the moratorium; the approved resolution plan simply determined the claim of the respondent as nil. Accordingly, vide the impugned judgment and order High Court dismissed the petition filed by the appellant under Article 227 of the Constitution of India.
20. Hence, the present appeal.
21. On 04.08.2023 notice was issued in the related SLP (C) No.15823/2023. It was submitted on behalf of the respondent that a sum of Rs.15,48,70,890.00 was withdrawn but gave an undertaking to deposit the said amount. This Court directed the respondent to deposit the said amount with the Executing Court with further direction to the Executing Court to invest the said amount in an interest bearing fixed deposit until further orders. In the hearing held on 20.02.2024, leave was granted.
22. Learned senior counsel for the appellant submits that the High Court had erroneously held that the resolution plan did not determine the 1380 [2025] 4 S.C.R.Supreme Court Reports claim of the respondent at nil and, therefore, the Facilitation Council had the jurisdiction to decide on the claim of the respondent.
22.1. He submits that the High Court had misread and misinterpreted the resolution plan which would be evident from a perusal of the relevant paragraphs of the resolution plan. Respondent had submitted its claim as an operational creditor to the resolution professional. Such claim was the same claim which formed the subject matter of the proceedings before the Facilitation Council. Resolution applicant had submitted a resolution plan in respect of the appellant (corporate debtor) in accordance with the provisions of Section 30 of the IBC to enable the appellant to continue as a going concern. A reading of the relevant paragraphs of the resolution plan i.e. paragraphs 3.2(v), 3.4(ii) and 3.8(i) would indicate that the claims of the operational creditors including the debt of the respondent were settled at nil and, therefore, they were not entitled to any payment.
22.2. On 17.04.2018, NCLT approved the resolution plan under Section 31 of the IBC. Paragraph 50 of the order dated 17.04.2018 specifically recorded that the claims of all the operational creditors were settled at nil. This Court in Civil Appeal No. 1133 of 2019 after going through the resolution plan had observed that there was nil payment to be made to all the operational creditors as per the resolution plan submitted and approved.
22.3. Learned senior counsel submits that on 17.04.2018 when the NCLT had approved the resolution plan, claims of the operational creditors were settled at nil. This became binding on the respondent and all other authorities as per Section 31(1) of the IBC. In this connection, learned senior counsel has referred to and relied upon the decision of this Court in Ajay Kumar Radheshyam Goenka Vs. Tourism Finance Corporation of India Ltd. 1 In the said decision, this Court had made it abundantly clear that the creditor has no option but to join the process under the IBC. Once the plan is approved, it would bind everyone under the sun. He contended that
1 (2023) 10 SCC 545
[2025] 4 S.C.R. 1381Electrosteel Steel Limited (Now M /s ESL Steel Limited) v. Ispat Carrier Private Limited the respondent had submitted its claim before the resolution professional but the same was not included in the resolution plan as was approved by the committee of creditors and then by the adjudicating authority i.e. NCLT which became binding on the respondent. Even if the respondent had not submitted its claim before the resolution professional, the approved resolution plan would still have been binding on the respondent.
22.4. He, therefore, submits that on approval of the resolution plan by the NCLT, claim of the respondent stood extinguished. Thus, respondent had no claim against the appellant (corporate debtor) in law. Respondent was also estopped from pursuing its claim before the Facilitation Council and also from seeking execution of the award after approval of the resolution plan.
22.5. After adverting to the objectives of the IBC, learned senior counsel submits that the appellant (corporate debtor) has been given a fresh and clean slate upon approval of the resolution plan. The same cannot be allowed to be defeated or frustrated by raising claims relatable to the period covered by the corporate insolvency resolution process. In this connection, learned senior counsel has placed reliance on the following decisions:
(i) Essar Steel India Ltd. Committee of Creditors Vs. Satish Kumar Gupta2
(ii) Ghanshyam Mishra & Sons (P) Ltd. Vs.
Edelweiss Asset Reconstruction Co. Ltd.3
(iii) Ruchi Soya Industries Ltd. Vs. Union of India 4
(iv) RPS Infrastructure Ltd. Vs. Mukul Kumar5
22.6. On the basis of the above decisions, learned senior counsel submits that it would lead to an absurd situation if the respondent and other operational creditors are permitted to pursue their individual claims even after the corporate debtor
2 (2020) 8 SCC 531
3 (2021) 9 SCC 657
4 (2022) 6 SCC 343
5 (2023) 10 SCC 718
1382 [2025] 4 S.C.R.Supreme Court Reports goes through a successful corporate insolvency resolution process (CIRP) where the claims of the operational creditors were settled at nil in the resolution plan which was approved by the committee of creditors and finally by the adjudicating authority (NCLT). In such a case, the corporate debtor would once again have to struggle to sustain itself as a going concern to satisfy such claims. Thus, the object or the purport of IBC would be defeated.
22.7. Adverting to a decision of this Court in Adani Power Ltd. Vs. Shapoorji Pallonji & Co. Pvt. Ltd. 6 , learned senior counsel submits that this Court has held that the resolution plan, as approved, is binding on all and cannot be made subject matter of arbitration or any other proceedings. Once the resolution plan is approved, the resolution applicant cannot be settled with any liability except what is mentioned in the resolution plan.
22.8. Learned senior counsel further submits that the resolution plan or the terms thereof could have been challenged by the respondent in the manner provided under Section 32 read with Section 61(3) of the IBC. Further, Section 63 of the IBC makes it abundantly clear that no civil court or authority shall have jurisdiction to entertain any suit or proceedings in respect of any matter over which NCLT or NCLAT has jurisdiction under the IBC and that a civil court would not have any jurisdiction.
22.9. He submits that respondent had accepted the resolution plan as approved and did not prefer any challenge thereto or the order of the NCLT approving the resolution plan. On the other hand, some operational creditors challenged the order dated 17.04.2018 passed by the NCLT approving the resolution plan. However, those challenges were dismissed by the NCLAT.
When the matter reached this Court in Civil Appeal No. 1133 of 2019, this Court vide the order dated 27.11.2019 had clarified that implementation of the resolution plan was not stayed while dismissing the appeal.
22.10. Thus, the Facilitation Council lacked jurisdiction in respect of the claim of the respondent which was part of the subject 6 Civil Appeal No. 1741 of 2023 [2025] 4 S.C.R. 1383Electrosteel Steel Limited (Now M /s ESL Steel Limited) v. Ispat Carrier Private Limited matter of the resolution plan. Facilitation Council could not have continued with the arbitration proceedings and could not have passed the award in view of Section 63 read with Section 238 of the IBC. Therefore, learned senior counsel would submit that the award passed by the Facilitation Council is a nullity and non est in the eye of law. This award has been passed in respect of a claim which stood extinguished and did not exist in law.
22.11. Learned senior counsel submits that an award can be challenged in an execution proceeding on the ground of it being a nullity. In the instant case, Facilitation Council lacked jurisdiction to pass the award. Even if the appellant had not challenged the award under Section 34 of the 1996 Act, the issue of nullity could still be raised at the stage of execution. In this connection, learned senior counsel has referred to a decision of this Court in Sarwan Kumar Vs. Madam Lal Aggarwal 7 . In the circumstances, learned senior counsel submits that appellant was well within its right to object to execution of the award by contending that the award itself is a nullity since the Facilitation Council inherently lacked jurisdiction to arbitrate on the claim of the respondent post approval of the resolution plan.
22.12. In view of the above, learned senior counsel for the appellant submits that the execution petition filed by the respondent for execution of the award ought to have been dismissed by the Executing Court. High Court committed a manifest error in declining to entertain the objections filed by the appellant to execution of the award. That being the position, impugned order of the High Court is liable to be set aside, so also the execution proceedings.
23. Learned senior counsel for the respondent on the other hand supports the impugned order passed by the High Court.
23.1. He submits that the corporate debtor (appellant) which was being managed by the resolution professional, had knowledge of the arbitral award. As a matter of fact, appellant had taken
7 (2003) 4 SCC 147
1384 [2025] 4 S.C.R.Supreme Court Reports shelter of the arbitral award to get the revision petition filed by the respondent before the Calcutta High Court disposed of. The revision petition was filed against an order passed under Section 14 of the 1996 Act. It was submitted before the High Court that an arbitral award was passed by the Facilitation Council and on the basis of such submission, Calcutta High Court had disposed of the aforesaid proceedings observing that Section 14 proceedings had been rendered infructuous leaving the partes to avail their remedies in accordance with law.
23.2. Learned counsel submits that upon approval of the resolution plan, the proceedings which were stayed by the Facilitation Council in view of the moratorium, did not automatically get terminated. On the contrary those stood revived. He submits that operational creditors whose claims were pending adjudication at the time of initiation of the corporate insolvency resolution process, formed a different class. Proceedings initiated by them would continue post lifting of moratorium for the purpose of quantification of their claims.
23.3. It is evident from the order passed by the Calcutta High Court that the appellant was aware of the arbitral award. Appellant did not challenge the award despite liberty granted by the High Court. Without challenging the award under Section 34 of the 1996 Act, it was not open to the appellant to challenge the same in a proceeding under Section 47 of the CPC.
23.4. Learned senior counsel for the respondent distinguished the case of Ghanshyam Mishra (supra) by contending that the said judgment was rendered in a distinguishable factual situation where the creditor had failed to lodge its claim upon public announcement by the resolution professional. Therefore, this Court held that such a creditor cannot file its claim thereafter and such claim gets extinguished. This judgment does not deal with claims filed before the interim resolution professional or resolution professional and not included in the resolution plan. High Court had noticed this fact and has rightly observed that since the respondent does not fall in the category of operational creditors whose claims were rendered nil, there was no occasion for the respondent to challenge the resolution plan.
[2025] 4 S.C.R. 1385Electrosteel Steel Limited (Now M /s ESL Steel Limited) v. Ispat Carrier Private Limited
23.5. Learned counsel submits that there is no inconsistency between IBC and the MSME Act. Therefore, High Court rightly did not examine the plea of inconsistency.
23.6. He has referred to various provisions of the IBC as well as to the decision of this Court in Ghanshyam Mishra (supra) and submits that imposition of moratorium and consequential approval of resolution plan does not terminate or put an end to pending proceedings but those were merely stayed. Legislature has not provided that upon approval of a resolution plan, all pending proceedings would get extinguished. Therefore, post expiry of the moratorium period, pending proceedings such as arbitral proceedings would stand revived and taken to their logical conclusion.
23.7. Learned senior counsel submits that in the present case, respondent had lodged its claim before the interim resolution professional and had also informed about the pendency of proceedings before the Facilitation Council. Interim resolution professional had published an information memorandum on 20.10.2017 mentioning therein a list of claimants which did not include operational creditors whose claims were sub-judiced before different judicial fora. Validity of such claims would be decided after the judicial proceedings were complete. He submits that after lifting of moratorium, notices were duly issued to the appellant by the Facilitation Council but the appellant decided not to appear and contest the proceedings. After the award was passed, appellant did not challenge the same under Section 34 of the 1996 Act. Having not challenged the award in the forum designated by law, he could not have challenged the same by filing objections to the arbitral award in a proceeding under Section 47 of the CPC. Learned counsel asserts that Section 34 of the 1996 Act is the only acknowledged remedy available to challenge an award. Appellant had the opportunity to assail the award under Section 34 of the 1996 Act but he did not do so. Therefore, filing of application to declare the award a nullity in execution proceedings instituted by the respondent for execution of the award is a clear abuse of the process of law and was rightly rejected by the Executing Court which decision has been upheld by the High Court. Learned counsel further submits that since the claim of the respondent was pending 1386 [2025] 4 S.C.R.Supreme Court Reports before the Facilitation Council and in view of the information memorandum issued by the interim resolution professional, there was no need for the respondent to have challenged the resolution plan. Therefore, the High Court was fully justified in rejecting the petition filed by the appellant under Article 227 of the Constitution of India. The appeal is devoid of any merit and should, therefore, be dismissed.
24. Submissions made by learned counsel for the parties have received the due consideration of the Court.
Continue reading
Sign in and become a member to continue reading this judgment and every other document in the library.
Members read the full text, download where permitted, and keep notes and bookmarks.