Union Territory of J & K (Previously State of Jammu & Kashmir) & Anr. v. Raja Muzaffar Bhat & Ors.
- Citation
- 2025 INSC 1025; [2025] 8 S.C.R. 2056
- Court
- Supreme Court of India
- Bench
- 2 Judges: Justice Pamidighantam Sri Narasimha
- Decided
- 22 Aug 2025
- Case number
- CIVIL APPEAL No. 8055/2022
- Sections
- 23C, 3, 4
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:18 am. Original source ↗
Preview: first 50% of the document.
[2025] 8 S.C.R. 2056 : 2025 INSC 1025 Union Territory of J & K (Previously State of Jammu & Kashmir) & Anr.
v.
Raja Muzaffar Bhat & Ors.
(Civil Appeal No. 8055 of 2022)
22 August 2025 [Pamidighantam Sri Narasimha and Atul S. Chandurkar, JJ.] Issue for Consideration Accepting the recommendations of the EAC, the State Environment Impact Assessment Authority (SEIAA) granted Environmental Clearance (EC) to the project proponent on 19.04.2022. Aggrieved by the issuance of EC dated 19.04.2022, person interested in environment, respondent no.1 filed an appeal before the National Green Tribunal (NGT), which was allowed. Whether the decision of NGT requires any interference.
Headnotes† Environment (Protection) Act, 1986 – Sustainable Sand Mining Management Guidelines, 2016 – Enforcement and Monitoring Guidelines for Sand Mining, 2020 – Environment Impact Assessment Notification, 2006 – Environment Impact Assessment Notification, 2016 – The National Highway Authority of India awarded a contract to the project proponent for construction of a 4-lane bypass/ring road around Srinagar City – Four mineral blocks were reserved for the project proponent to excavate, develop and utilise the mineral – The project proponent applied for environment clearances (EC) for extraction of sand and gravel in the 3 blocks – J&K Expert Appraisal Committee (J&K EIAA) by its order dated 02.03.2022 granted the environmental clearance, however, it specifically recorded that the District Survey Report is not formulated as per guidelines and therefore it needs revision for including the replenishment data – Following, SEIAA granted EC to the project proponent on 19.04.2022 – Aggrieved by issuance of EC, respondnet no.1 filed appeal before the NGT – NGT allowed the appeal and held that the EC was granted despite the DSR not being prepared in line with the guidelines – Challenge to: [2025] 8 S.C.R. 2057Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
Held: The purpose and objective of preparing such District Survey Report (DSR) is to scientifically locate the place for sand mining after calculation of annual rate of replenishment for allowing mining in the area – The replenishment report is an integral part of the DSR – In light of Guidelines, 2016 and the Guidelines, 2020, the absence of a replenishment study renders a DSR fundamentally defective – These guidelines categorically require that any assessment of mineable mineral quantity must be premised on scientific estimation of replenishment rates, failing which the DSR lacks the foundational data necessary to determine sustainable extraction limits – If the DSR becomes the foundation for consideration of an application for environmental clearance, then it is compelling to ensure replenishment studies are undertaken in advance and the report forms an integral part of the DSR – A District Survey Report without a proper replenishment study is untenable – On facts, J&K EIAA compromised with regulatory integrity by granting the environment clearances (EC) on the basis of a DSR without a replenishment report – The compromise sought to be achieved by permitting the project proponent to go ahead with a “restricted mining depth of maximum 1 meter and bulk density of 2.0 for production of the mineral and supplying it to maximum production of 34800 mt in view of non-availability of replenishment data” is unacceptable – Thus, the decision of the NGT is upheld. [Paras 1, 29, 32, 33, 37, 39] Sustainable Sand Mining Management Guidelines, 2016 – Guiding principle:
Held: The 2016 guidelines are based on the principle that unregulated sand mining is unsustainable and must be controlled – Compliance with existing and future laws is mandatory rather than optional – Leaseholders should be allowed to self-regulate, provided they demonstrate adherence to legal requirements – However, if self-regulation proves ineffective, stricter enforcement and monitoring will be necessary, with penalties imposed in accordance with the law – Additionally, environmental protection and public well-being must be prioritized, ensuring that natural resources are utilized responsibly to contribute positively and sustainably to the economy – The prime objective of the said Guidelines is to ensure that sand mining is done in an environmentally sustainable and socially responsible manner. [Para 24] 2058 [2025] 8 S.C.R.Supreme Court Reports Sustainable Sand Mining Management Guidelines, 2016 – Preparation of District Survey Report – Relevance and Scope: Held: As per the 2016 Guidelines, the preparation of DSR is essential for (i) identification of areas of aggradation/deposition where mining can be allowed, (ii) calculation of annual rate of replenishment, (iii) identifying ways of scientific and systematic mining, (iv) implementing safeguards in place to ensure the mining carried out is sustainable – The scope of the DSR should include detailed information for each district, covering rivers, streams, and other sand sources, along with the availability of sand, gravel, and aggregate resources – It must also provide data on existing mining leases for these materials – Additionally, the classification of mining areas should distinguish between sections of rivers, streams, and other sources that are suitable for sand and aggregate extraction and those where such activities are strictly prohibited – It is further provided that such survey document shall be prepared in the district based on direct and indirect benefits of mining and identification of the potential threats to the river/stream beds in the district. [Para 26] Case Law Cited State of UP v. Gaurav Kumar, 2025 SCC OnLine SC 1069;
Deepak Kumar v. State of Haryana [2012] 4 SCR 819 : (2012) 4 SCC 629 – referred to.
Satendra Pandey v. MoEFCC, 2018 SCC OnLine NGT 2388 – referred to.
Books & Periodicals Cited E.S. Rentier, L.H. Cammeraat, The Environmental Impacts of River Sand Mining, Science of the Total Environment, Vol. 838, Part I, 2022; Hamed Haghnazar, et al - Evaluation of infilling and replenishment of river sand mining pits, Environmental Earth Sciences, Vol. 79 (14), 2020 – referred to.
List of Acts Mines and Minerals (Development and Regulation) Act, 1957; Water (Prevention and Control of Pollution) Act, 1974; Air (Prevention and Control of Pollution) Act, 1981; Environment (Protection) Act, 1986; Sustainable Sand Mining Management Guidelines, 2016; Enforcement and Monitoring Guidelines for Sand Mining, [2025] 8 S.C.R. 2059Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
2020; Environment Impact Assessment (EIA) Notification, 1994; Environment Impact Assessment Notification, 2006; Environment Impact Assessment Notification, 2016; Transportation of Minerals and Prevention of Illegal Mining Rules, 2016.
List of Keywords Environmental clearance; Mining; Sand; District Survey Report; Environmentally sustainable; Socially responsible manner; Replenishment data; Environmental protection; Replenishment report is an integral part of the DSR; Rate of replenishment. Case Arising From CIVIL APPELLATE JURISDICTION: Civil Appeal No. 8055 of 2022 From the Judgment and Order dated 28.09.2022 of the National Green Tribunal at New Delhi in AN No. 24 of 2022 With Civil Appeal No. 68 of 2023 and Civil Appeal No. 11027 of 2025 Appearances for Parties Advs. for the Appellants:
Narender Hooda, Sr. Adv., Dr. Surender Singh Hooda, Ms. Pallvi Hooda, Shiv Bhatnagar, Yuvraj Nandal, Ms. Kavya Manuja, Ms. Kavya Manuja, Ms. Tannu, Utsav Singh Bains, Akash Yadav, Yusuf, G.M. Kawoosa, Pashupathi Nath Razdan.
Advs. for the Respondents:
Ms. Anitha Shenoy, Sr. Adv., Ms. Srishti Agnihotri, Ms. Sanjana Grace Thomas, Ms. Itisha Awasthi, Ms. Sadhana Madhavan, Ms. Kavana Rao, D.P. Singh, Ms. Tara Elizabeth Kurien.
Judgment / Order of the Supreme Court Judgment Contents*
1. Introduction of the issue: ...................................................... 2
2. Factual Background: ............................................................ 4 * Ed. Note: Pagination as per the original Judgment.
2060 [2025] 8 S.C.R.Supreme Court Reports
3. The Legal and Regulatory Regime: ..................................... 6
4. The Environment (Protection) Act: ....................................... 7
5. EIA Notifications 1994: ......................................................... 7
6. The Environment Impact Assessment Notification, 2006: ...... 8
7. Decision of this Court in Deepak Kumar v. State of Haryana: .... 9
8. Environment Impact Assessment Notification, 2016: ............ 12 A. Establishment of District Level Environment Impact Assessment Authority (DEIAA) & District Expert Appraisal Committee (DEAC) under Para 3A: ............ 14 B. New category called Category B2 for sandmining in districts was introduced through para 4(iv): ................ 14 C. Preparation of District Survey Report (DSR) Introduced through Para 7(iii): ..................................... 14 D. Procedure for preparation of DSR introduced through Appendix X: .................................................................. 15 E. Challenge to the Notification 2016 the direction of NGT in Satendra Pandey’s case: ............................... 17
9. The Sand Mining Guidelines and the Focus on Replenishment Study: .................................................................................... 18 A. Sustainable Sand Mining Management Guidelines, 2016: ............................................................................ 19 B. Enforcement and Monitoring Guidelines for Sand Mining, 2020: ........................................................................... 22 10.Need for replenishment study: ............................................. 25
11. Application of law to the facts of the present case .............. 27
1. Introduction of the issue:
1. In State of UP v. Gaurav Kumar1, we have declared that a valid and subsisting District Survey Report 2 is mandatory for grant of 1 2025 SCC OnLine SC 1069 2 Hereinafter, “DSR”.
[2025] 8 S.C.R. 2061Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
environmental clearance3 for sand mining. We have also annulled certain environmental clearances, even though recommended by District Expert Appraisal Committee4 and granted by District Level Environment Impact Assessment Authority5 , on the basis that a ‘draft DSR’ is untenable6 in law. In this appeal we take a step further. District Survey Reports are prepared under para 7(iii) of EIA notification dated 15.01.20167 following the mandatory procedure laid down in Appendix X read with Sustainable Sand Mining Management Guidelines, 2016 8 and Enforcement and Monitoring Guidelines for Sand Mining, 20209 .
The purpose and objective of preparing such District Survey Report is to scientifically locate the place for sand mining after calculation of annual rate of replenishment for allowing mining in the area.
2. Just as forest conservation requires assessment of tree growth rate before permitting timber harvesting to ensure that felling of trees does not exceed tree growth, a replenishment study enables us to take an informed decision as to whether sand mining can be permitted without degrading the rivers’ natural balance. Importance of replenishment study is explained in the Sand Mining Guidelines 2020 as follows:
“The need for replenishment study for river bed sand is required in order to nullify the adverse impacts arising due to excessive sand extraction. Mining within or near riverbed has a direct impact on the stream‘s physical characteristics, such as channel geometry, bed elevation, substratum composition and stability, in-stream roughness of the bed, flow velocity, discharge capacity, sediment transport capacity, turbidity, temperature etc. Alteration or modification of the above attributes may cause an impact on the ecological equilibrium of the riverine regime, disturbance in channel configuration and flow-paths. This may also cause an adverse impact on in-stream biota and 3 Hereinafter, “EC”.
4 Hereinafter, “DEAC”.
5 Hereinafter, “DEIAA”.
6 State of UP v. Gaurav Kumar, 2025 SCC OnLine SC 1069. 7 Issued under Environment (Protection) Act, 1986.
8 Hereinafter, Sand Mining Guidelines, 2016.
9 Hereinafter Sand Mining Guidelines, 2020.
2062 [2025] 8 S.C.R.Supreme Court Reports riparian habitats. It is assumed that the riparian habitat disturbance is minimum if the replenishment is equal to excavation for a given stretch. Therefore, to minimize the adverse impact arising out of sand mining in a given river stretch, it is imperative to have a study of replenishment of material during the defined period.” 10
3. It is, therefore, compelling to hold that a DSR is valid and tenable only when a proper replenishment study is conducted.
2. Factual Background:
4. The facts germane to the issue, and necessary for disposal of these appeals are as follows: The project proponent submitted three proposals for undertaking mining activities in (i) Block 1, Driegam Bridge Downstream, Shaliganga Nallah Bed Mining Project, (ii) Block-2 Banderpora Upstream, Shaliganga Nallah Bed Mining Project and (iii) Block 4, Panzam Bridge to Trumbi Bridge (Lalgam) Downstream. The J&K UT Expert Appraisal Committee (“J&K UT EAC” hereinafter) in its 81st meeting dated 03.01.2022 discussed the said proposals and rejected the same, particularly on grounds that the proposed area of extraction is already over-exploited and is depleted due to heavy illegal mining. It also noted that the DSR prepared for the concerned district was not formulated as per guidelines as the same needs revision for including replenishment data.
5. In the meanwhile, the project proponent received ‘Fit for Mining Certificate’ for Blocks 1, 2 and 4 from the Geology and Mining Department on 05.02.2022.
6. Following certification of mining department, the project proponent submitted its second proposal. Having considered the said proposal in its 87 th meeting on 02.03.2022, the J&K UT EAC recommended the project for grant of EC. While recommending grant of EC, the J&K UT EAC clearly recorded and reiterated that DSR is not being formulated as per the guidelines.
7. Accepting the recommendations of the EAC, the State Environment Impact Assessment Authority 11 granted EC to the project proponent 10 Guidelines formulated under Section 23C of MMDR Act, 1957. 11 Hereinafter, “SEIAA”.
[2025] 8 S.C.R. 2063Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
on 19.04.2022. While granting the EC, SEIAA restricted the depth of mining to maximum of 1 meter in view of “non-availability of replenishment data” in the DSR.
8. Challenge to the grant of EC: Aggrieved by the issuance of EC dated 19.04.2022, person interested in environment, respondent no. 1 filed an appeal before the National Green Tribunal 12 primarily impugning the grant of EC on the grounds that;
“i. The Environmental Clearances dated 19.04.2022 were granted without taking into account the grounds on which the previous proposals of the project proponent were rejected and continued to grant Environmental Clearances without due consideration of the same;
ii. Violation of Rule 4(iv) of Jammu and Kashmir Minor Mineral Concession, Storage, Transportation of Minerals and Prevention of Illegal Mining Rules, 2016 which prohibits any minor mineral concession being granted within a distance of 25 meters of any embankment;
iii. The Environmental Clearances have been granted despite the District Survey Report not being prepared in line with the Guidelines, as noted by JKEAC;
iv. Violations of conditions of the Environmental Clearances dated 19.04.2022 by the project proponent who undertook certain activities strictly prohibited under the Environmental Clearance.”
(emphasis supplied)
9. The Tribunal, vide the order impugned before us allowed the appeal and set aside the EC dated 19.04.2022 finding it to be violative of environmental norms. Thus, the present appeals.
3. The Legal and Regulatory Regime:
10. The significance of mining for economic development, particularly in relation to industries involved in infrastructure development, energy, cement etc has long been recognised. In exercise of its 12 Hereinafter, “Tribunal”.
2064 [2025] 8 S.C.R.Supreme Court Reports legislative competence, Parliament enacted the Mines and Minerals (Development and Regulation) Act, 1957 13 , for development and regulation of mines and minerals in the country. This legislation is, however, not concerned with safeguarding environmental interests. For that purpose, we have the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, and the Environment (Protection) Act, 1986, as well as policy measures such as the National Mineral Policies of 2008 and 2019.
4. The Environment (Protection) Act:
11. The Environment (Protection) Act, 1986 is a comprehensive legislation enacted with the object of protecting and improving the environment. Under Sections 3 and 5 of the Act, the Central Government is empowered to take all such measures as may be necessary for the purpose of preventing, controlling and abating environmental pollution.
5. EIA Notifications 1994:
12. In exercise of the powers conferred under Sections 3 and 5, MoEF&CC issued the Environment Impact Assessment (EIA) Notification, 199414 , which marked a significant shift in environmental governance by making prior environmental clearance mandatory for specified categories of industrial and development projects, including mining. The Notification laid down a procedural framework for assessing the likely environmental impact of proposed projects, mandating submission of detailed information, public consultation, and mitigation plans. Schedule I to the Notification listed 29 categories of projects requiring prior approval, with Item 20 expressly covering mining activities. Thus, the legislative intent was clear; no mining activity, whether new, expanded, or modernised could proceed without rigorous environmental scrutiny and express prior clearance from the competent authority.
6. The Environment Impact Assessment Notification, 2006:
13. The regulatory framework underwent further consolidation with the issuance of the EIA Notification dated 14.09.2006 15 . The 13 Hereinafter, “MMDR Act”.
14 Hereinafter, “1994 Notification”.
15 Hereinafter, “2006 Notification”.
[2025] 8 S.C.R. 2065Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
2006 Notification introduced a more elaborate, decentralised, and categorised approach to environmental appraisal. It classified projects into Category A and Category B, based on their potential environmental impact and scale, with Category A projects requiring clearance at the Central level and Category B projects at the State level, through the SEIAA. Para 2 of the 2006 Notification reads as under;
2. Requirements of prior Environmental Clearance (EC):- The following projects or activities shall require prior environmental clearance from the concerned regulatory authority, which shall hereinafter referred to be as the Central Government in the Ministry of Environment and Forests for matters falling under Category ‘A’ in the Schedule and at State level the State Environment Impact Assessment Authority (SEIAA) for matters falling under Category ‘B’ in the said Schedule, before any construction work, or preparation of land by the project management except for securing the land, is started on the project or activity:
(i) All new projects or activities listed in the Schedule to this notification;
(ii) Expansion and modernization of existing projects or activities listed in the Schedule to this notification with addition of capacity beyond the limits specified for the concerned sector, that is, projects or activities which cross the threshold limits given in the Schedule, after expansion or modernization;
(iii) Any change in product - mix in an existing manufacturing unit included in Schedule beyond the specified range.
14. Para 5, 6 and 7 gives a detailed procedure for grant of prior EC. Further, Para 8 talks about the final stage of grant or rejection of prior EC. Para 9 deals with the tenure and validity of an EC while Para 10 provides for post grant monitoring. The Appendix III enumerates the generic structure of an EIA application and its essentials. Over the course of years, this EIA Notification, 2006 underwent various amendments further strengthening the EC norms and laying down of detailed procedure thereto.
2066 [2025] 8 S.C.R.Supreme Court Reports
7. Decision of this Court in Deepak Kumar v. State of Haryana:
15. While the statutory framework under the Environment (Protection) Act, 1986 and the EIA Notification of 2006 laid down the procedural architecture for environmental clearance, judicial intervention became necessary to address persisting regulatory lapses, particularly in the context of sand mining. A seminal instance of such intervention is found in Deepak Kumar v. State of Haryana 16, wherein the Supreme Court examined the legality of mining leases granted in the State of Haryana without prior environmental appraisal. This Court deprecated the practice of issuing auction notices for minor mineral extraction without first conducting scientific studies to assess the environmental impact. Emphasising the need for a precautionary approach, the Court underscored that no mining activity, however minor, could be permitted without an environmental clearance based on a proper replenishment study and sustainable extraction limits. This decision reaffirmed the necessity of grounding regulatory approvals in scientific analysis, and has since served as a judicial benchmark in ensuring that mining activities are aligned with environmental safeguards. This Court held as under:
“8…………. Sand mining on either side of the rivers, upstream and instream, is one of the causes for environmental degradation and also a threat to the biodiversity. Over the years, India’s rivers and riparian ecology have been badly affected by the alarming rate of unrestricted sand mining which damage the ecosystem of rivers and the safety of bridges, weakening of riverbeds, destruction of natural habitats of organisms living on the riverbeds, affects fish breeding and migration, spells disaster for the conservation of many bird species, increases saline water in the rivers, etc.
9. Extraction of alluvial material from within or near a streambed has a direct impact on the stream’s physical habitat characteristics. These characteristics include bed elevation, substrate composition and stability, instream roughness elements, depth, velocity, turbidity, sediment transport, stream discharge and temperature. Altering 16 (2012) 4 SCC 629. Hereinafter, “Deepak Kumar”.
[2025] 8 S.C.R. 2067Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
these habitat characteristics can have deleterious impacts on both instream biota and the associated riparian habitat. The demand for sand continues to increase day by day as building and construction of new infrastructures and expansion of existing ones is continuous thereby placing immense pressure on the supply of the sand resource and hence mining activities are going on legally and illegally without any restrictions. Lack of proper planning and sand management cause disturbance of marine ecosystem and also upset the ability of natural marine processes to replenish the sand.
10. We are expressing our deep concern since we are faced with a situation where the auction notices dated 3-6-2011 and 8-8-2011 have permitted quarrying, mining and removal of sand from instream and upstream of several rivers, which may have serious environmental impact on ephemeral, seasonal and perennial rivers and riverbeds and sand extraction may have an adverse effect on biodiversity as well. Further, it may also lead to bed degradation and sedimentation having a negative effect on the aquatic life. The rivers mentioned in the auction notices are on the foothills of the fragile Shivalik Hills. Shivalik Hills are the source of rivers like Ghaggar, Tangri, Markanda, etc. River Ghaggar is a seasonal river which rises up in the outer Himalayas between Yamuna and Satluj and enters Haryana near Pinjore, District Panchkula, which passes through Ambala and Hissar and reaches Bikaner in Rajasthan. River Markanda is also a seasonal river like Ghaggar, which also originates from the lower Shivalik Hills and enters Haryana near Ambala. During monsoon, this stream swells up into a raging torrent, notorious for its devastating power, as also, River Yamuna.
11. We find that it is without conducting any study on the possible environmental impact on/in the riverbeds and elsewhere the auction notices have been issued. We are of the considered view that when we are faced with a situation where extraction of alluvial material within or near a riverbed has an impact on the river’s physical habitat 2068 [2025] 8 S.C.R.Supreme Court Reports characteristics, like river stability, flood risk, environmental degradation, loss of habitat, decline in biodiversity, it is not an answer to say that the extraction is in blocks of less than 5 ha, separated by 1 km, because their collective impact may be significant, hence the necessity of a proper environmental assessment plan.
* * *
25. Quarrying of river sand, it is true, is an important economic activity in the country with river sand forming a crucial raw material for the infrastructural development and for the construction industry but excessive instream sand and gravel mining causes the degradation of rivers. Instream mining lowers the stream bottom of rivers which may lead to bank erosion. Depletion of sand in the streambed and along coastal areas causes the deepening of rivers which may result in destruction of aquatic and riparian habitats as well. Extraction of alluvial material as already mentioned from within or near a streambed has a direct impact on the stream’s physical habitat characteristics.
26. We are of the considered view that it is highly necessary to have an effective framework of mining plan which will take care of all environmental issues and also evolve a long-term rational and sustainable use of natural resource base and also the bio-assessment protocol. Sand mining, it may be noted, may have an adverse effect on biodiversity as loss of habitat caused by sand mining will affect various species, flora and fauna and it may also destabilise the soil structure of river banks and often leaves isolated islands. We find that, taking note of those technical, scientific and environmental matters, MoEF, Government of India, issued various recommendations in March 2010 followed by the Model Rules, 2010 framed by the Ministry of Mines which have to be given effect to, inculcating the spirit of Article 48-A and Article 51-A(g) read with Article 21 of the Constitution.”
(emphasis supplied)
[2025] 8 S.C.R. 2069Union Territory of J & K (Previously State of J ammu & K ashmir) & Anr. v. Raja Muzaffar Bhat & O rs.
8. Environment Impact Assessment Notification, 2016:
16. The observations made by this Court in Deepak Kumar (supra) laid down the jurisprudential foundation for requiring scientific scrutiny, particularly through District Survey Reports (DSRs) before permitting sand mining even at the local level. Recognising the ecological fragility of riverbeds and the unchecked nature of minor mineral extraction, the Central Government, in response to the said judgment, amended the EIA Notification of 2006 on 15.01.2016, to introduce a distinct regulatory framework for riverbed and sand mining. These amendments introduced specific procedures for cluster-based assessments and made replenishment studies integral to the clearance process. The preamble to the amended Notification is instructive and enables us to understand the purpose, scope, and statutory contours of the DSR, which now forms the central point of scrutiny in the present case. The preamble is as follows: “And whereas, in pursuance to the order of Hon’ble Supreme Court dated the 27th February, 2012 in I.A. No.12- 13 of 2011 in Special Leave Petition (C) No.19628-19629 of 2009, in the matter of Deepak Kumar etc. Vs. State of Haryana and Others etc., prior environmental clearance has now become mandatory for mining of minor minerals irrespective of the area of mining lease;
And whereas, as a result of the above said Order of Hon’ble Supreme Court, the number of cases which are now required to obtain prior environmental clearance has increased substantially;
And whereas, the Hon’ble National Green Tribunal, vide its order dated the 13th January, 2015 in the matter regarding sand mining has directed for making a policy on environmental clearance for mining leases in cluster for minor minerals;
And whereas, the State Governments have represented for streamlining the process of environmental clearance for mining of minor mineral;
And whereas, the Ministry of Environment, Forest and Climate Change in consultation with State Governments has prepared Guidelines on Sustainable Sand Mining 2070 [2025] 8 S.C.R.Supreme Court Reports detailing the provisions on environmental clearance for cluster, creation of District Environment Impact Assessment Authority and proper monitoring of sand mining using information technology and information technology enabled services to track the mined out material from source to destination;
Now, therefore, in exercise of the powers conferred by sub-section (1) and clause (v) of sub-section (2) of section 3 of the Environment (Protection) Act, 1986 read with clause (d) of sub-rule (3) of rule 5 of the Environment (Protection) Rules, 1986, the Central Government hereby makes the following amendments in the said notification, namely:- In the said notification,-
(a) in paragraph 2, after the words “in the said Schedule”, the following words shall be inserted, namely:- “and at District level, the District Environment Impact Assessment Authority (DEIAA) for matters falling under Category ‘B2’ for mining of minor minerals in the said Schedule”;
(b) after paragraph 3, the following paragraph shall be inserted…”
A. Establishment of District Level Environment Impact Assessment Authority (DEIAA) & District Expert Appraisal Committee (DEAC) under Para 3A:
Continue reading
Sign in and become a member to continue reading this judgment and every other document in the library.
Members read the full text, download where permitted, and keep notes and bookmarks.