Vanashakti v. Union of India
- Citation
- 2025 INSC 961; [2025] 8 S.C.R. 760
- Court
- Supreme Court of India
- Bench
- 2 Judges: Justice Bhushan Ramkrishna Gavai, Justice * Cji and K. Vinod Chandran, Justice J.]
- Decided
- 5 Aug 2025
- Case number
- WRIT PETITION (CIVIL) No. 166/2025
- Sections
- 3, 20
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:18 am. Original source ↗
Preview: first 50% of the document.
[2025] 8 S.C.R. 760 : 2025 INSC 961 Vanashakti v.
Union of India (Writ Petition (C) No. 166 of 2025)
05 August 2025 [B.R. Gavai,* CJI and K. Vinod Chandran, J.] Issue for Consideration The present petition challenges the notification dated 29.01.2025 (impugned notification) bearing number S.O. 523(E) issued by the Ministry of Environment, Forest and Climate Change (MoEF&CC) and the Office Memorandum (O.M.) dated 30.01.2025 issued by the MoEF&CC.
Headnotes† Environment – Protection – Construction Projects – Environmental clearance – Challenge to Notification dated 29.01.2025 and O.M. dated 30.01.2025 – According to the petitioner, the impugned notification dated 29.01.2025 totally changes the regime, which was provided by the notification dated 14.09.2006 issued by the Ministry of Environment and Forests:
Held: The notification dated 29.01.2025 excluding Note 1 to Entry 8(a) is upheld – Note 1 to Entry 8(a) of the notification dated 29.01.2025 is arbitrary and is quashed and set aside – The clarificatory O.M. dated 30.01.2025, which has also been impugned in the present petition, rather than being adverse to the environmental interest is conducive to the environmental interest, inasmuch as it also makes the conditions applicable to the State of Kerala – Thus, the O.M. dated 30.01.2025 issued by the MoEF&CC is also upheld. [Paras 44-47] Environment Protection Act, 1986 – Notification dated 14.09.2006 issued by the Ministry of Environment and Forests – Notification dated 29.01.2025 issued by the Ministry of Environment, Forest and Climate Change (MoEF&CC) – Whether the exemption of applicability of 2006 notification, * Author [2025] 8 S.C.R. 761Vanashakti v. Union of India by way of Note 1 in column 5 of Entry 8(a) of the impugned notification (Notification dated 29.01.2025), to the projects or activities for industrial shed, school, college and hostel for educational institution appears to be in tune with the purpose for which the Environment Protection Act:
Held: The impugned notification dated 29.01.2025 is upheld – This Court is of the considered view that the exemption of applicability of 2006 notification, by way of Note 1 in column 5 of Entry 8(a) of the impugned notification, to the projects or activities for industrial shed, school, college and hostel for educational institution does not appear to be in tune with the purpose for which the Environment Protection Act has been enacted – It cannot be gainsaid that if any construction activity for an area of more than 20,000 sq. mtr. is to be carried out, it will naturally have an effect on the environment and ecology, even if the building is for industrial shed or for educational purpose, including hostels etc. – There is neither any rational nexus with the object to be achieved by excluding such buildings from the rigors of the notification – Therefore, see no reason to discriminate the other buildings with the buildings constructed for industrial or educational purposes. [Paras 40, 42] Environmental Law – Environmental protection vis-à-vis need for sustainable development – Discussed. [Paras 31-34] Case Law Cited In Re: Zudpi Jungle Lands, 2025 INSC 754 – relied on.
In Re: Construction of Park at Noida near Okhla Bird Sanctuary [2010] 15 SCR 783 : (2011) 1 SCC 744; Vellore Citizens’ Welfare Forum v. Union of India and Others, 1996 INSC 952 : [1996] Supp. 5 SCR 241 : (1996) 5 SCC 647; Jagannath v. Union of India and Others, 1996 INSC 1466 : [1996] Supp. 9 SCR 848 : (1997) 2 SCC 87; Consumer Education & Research Society v. Union of India and Others, 2000 INSC 81 : [2000] 1 SCR 907 : (2000) 2 SCC 599; Intellectuals Forum, Tirupathi v. State of A.P. and Others, 2006 INSC 101 : [2006] 2 SCR 419 : (2006) 3 SCC 549; Tata Housing Development Company Limited v. Aalok Jagga and Others, 2019 INSC 1203 : [2019] 13 SCR 577 : (2020) 15 SCC 784; State of Uttar Pradesh and Others v. Uday Education and Welfare Trust and Others, 2022 INSC 1129 : [2022] 19 SCR 781 : (2022) SCC OnLine SC 1469 – referred to.
762 [2025] 8 S.C.R.Supreme Court Reports List of Acts Environment Protection Act, 1986; Wild Life (Protection) Act, 1972; Water (Prevention and Control of Pollution) Act, 1974; Air (Prevention and Control of Pollution) Act, 1981.
List of Keywords Notification dated 29.01.2025; Ministry of Environment, Forest and Climate Change (MoEF&CC); Office Memorandum dated 30.01.2025; General Conditions; Notification dated 14.09.2006; State Environment Impact Assessment Authority (SEIAA); Entry 8(a) and 8(b) of Schedule; Principles of sustainable development; Built up area; Rational nexus with the object to be achieved. Case Arising From CIVIL ORIGINAL JURISDICTION: Writ Petition (C) No. 166 of 2025 Under Article 32 of the Constitution of India Appearances for Parties Advs. for the Petitioner:
Gopal Sankaranarayanan, Sr. Adv., Vanshdeep Dalmia, Ms. Anisha Jain, Ms. Shambhavi Singh, Ms. Shaurya Dasgupta.
Advs. for the Respondent:
Tushar Mehta, Solicitor General, Ms. Aishwariya Bhati, A.S.G., Ms. Ruchi Kohli, Mukul Rohtagi, Atmaram Nadkarni, Devdatt Kamat, P.V. Dinesh, Nikhil Goel, Aniruddha Joshi, Sr. Advs., Gurmeet Singh Makker, Mayank Pandey, Ms. Mili Baxi, Ms. Harshita Choubey, Rohan Gupta, Siddharth Dharmadhikari, Aaditya Aniruddha Pande, Shrirang B. Varma, Bharat Bagla, Sourav Singh, Aditya Krishna, Adarsh Dubey, Ms. Chitransha Singh Sikarwar, Samit Shukla, Ms. Saakhsi Saboo, Tarpit Patni, Ms. Sonam Singh, Ms. Vaibhavi Bhalerao, Ms. Devanshi Singh, M/s. Trilegal, Ms. Srishti Agnihotri, Ms. Anna Oommen, Ms. Sanjana Grace Thomas, D.p.singh, Ms. Tara Elizabeth Kurien, Ms. Anchal Kanthed, Vinayak Bhandari, Arnav Narain, Sanjay Kadam, Ms. Rajpurkar Sayalee Shrikant, Arvind Gupta, Kunal A Cheema, Vatsalya Vigya, Dilip Annasaheb Taur, Amol V Deshmukh, Samit Shukla, Ms. Saakshi Saboo, Ms. Vaibhavi Bhalerao, Shantanu Singh, Ravi Sehgal.
[2025] 8 S.C.R. 763Vanashakti v. Union of India Judgment / Order of the Supreme Court Judgment B.R. Gavai, CJI.
1. The present petition challenges the notification dated 29th January, 2025 bearing number S.O. 523(E) issued by the Ministry of Environment, Forest and Climate Change (hereinafter referred to as ‘the MoEF&CC’) and the Office Memorandum dated 30th January, 2025 issued by the MoEF&CC.
2. We have heard Shri Gopal Sankaranarayanan, learned senior counsel appearing on behalf of the petitioner and Shri P.V. Dinesh, learned senior counsel appearing on behalf of the intervenor(s), supporting the case of the petitioner.
3. We have also heard Ms. Aishwarya Bhati, learned Additional Solicitor General of India appearing for the Union of India (MoEF&CC), Shri Tushar Mehta, learned Solicitor General of India appearing for the State of Maharashtra, Shri Mukul Rohatgi and Shri Atmaram Nadkarni, learned senior counsel appearing for the intervenor(s) and other learned counsel.
4. Shri Gopal Sankaranarayanan, learned senior counsel, submits that the impugned notification dated 29th January, 2025 (hereinafter referred to as ‘the impugned notification’) totally changes the regime, which was provided by the notification dated 14 th September, 2006 issued by the Ministry of Environment and Forests (hereinafter referred to as ‘the 2006 notification’). Shri Sankaranarayanan, learned senior counsel, submits that the Union of India has been making consistent efforts to dilute the provisions contained in the 2006 notification by issuing notifications dated 22nd December, 2014 (hereinafter referred to as ‘the 2014 notification’), 9th December, 2016 (hereinafter referred to as ‘the 2016 notification’) and 14 th and 15 th November, 2018 (hereinafter referred to as ‘the 2018 notification’). It is submitted that 2014 notification was quashed and set aside by the High Court of Kerala vide judgment and order dated 6 th March, 2024. Similarly, it is submitted that the 2016 notification issued by the MoEF&CC was quashed and set aside by the National Green Tribunal, Principal Bench, New Delhi vide judgment dated 8 th December, 2017. He further submits that the 2018 notification has been stayed by the High Court of Delhi by an order dated 26th November, 2018. 764 [2025] 8 S.C.R.Supreme Court Reports
5. It is submitted by the learned senior counsel that the preamble of the 2025 notification does not refer to the judgment of the learned NGT and the order of the Delhi High Court. It is, therefore, submitted that the impugned notification suffers from suppression of material facts.
6. Shri Sankaranarayanan, learned senior counsel, further submits that under the 2006 notification, the General Conditions were applicable to the projects covered under Entry 8(a) and 8(b) of the Schedule. He submits that under the General Conditions, any project or activity within 10 kms. from the boundary of:
(i) Protected areas notified under the Wild Life (Protection) Act, 1972,
(ii) Critically polluted areas as identified by the Central Pollution Control Board from time to time,
(iii) Eco-sensitive areas as notified under Section 3 of the Environment (Protection) Act, 1986, such as Mahabaleshwar Panchgani, Matheran, Panchmarhi, Dahanu, Doon Valley and
(iv) Inter-State boundaries and international boundaries, are to be examined only by the MoEF&CC and not by the State Environment Impact Assessment Authority (for short, ‘SEIAA‘). He fairly concedes that the said restriction of 10 kms., has been subsequently brought down to 5 kms., by a subsequent notification.
7. Shri Sankaranarayanan, learned senior counsel, submits that having failed in its repeated attempts to dilute the restrictions as provided in 2006 notification, the MoEF&CC has come with the impugned notification which has the effect of nullifying the judgments passed by the High Court of Kerala and the NGT.
8. Shri Sankaranarayanan, learned senior counsel, further submits that the judgment and order passed by the learned NGT is challenged by way of an appeal before this Court. It is submitted that a coordinate Bench of this Court, after hearing the matter at length, on 23rd April, 2025 has reserved the matter for judgment. He, therefore, submits that as a matter of propriety this Court should refrain from deciding the issue in order to avoid any conflicting judgments.
9. Per contra, Ms. Aishwarya Bhati, learned Additional Solicitor General of India, submits that right from inception, the General Conditions were never made applicable to the projects or activities covered by [2025] 8 S.C.R. 765Vanashakti v. Union of India Entry 8 of the Schedule. She submits that the perusal of the Schedule of the 2006 notification would show that wherever it was intended that the General Conditions would apply, it has been specifically mentioned in column 5 thereof that the General Conditions would be applicable. She submits that wherever some other conditions were to be made applicable, column 5 specifically notes as to what are the conditions which would be applicable to such activity/project. She submits that, however, in order to bring clarity and in view of some of the orders passed by the learned NGT which required the notification to be issued after following the procedure prescribed by law, the impugned notification came to be notified.
10. Shri Mukul Rohatgi, learned senior counsel appearing for the intervenor(s), submits that the 2025 notification was brought by the Union of India, in view of the judgment of this Court in the case of In Re: Construction of Park at Noida near Okhla Bird Sanctuary 1 . It is submitted that though this Court has recorded the submission that for the activity/project in Entry 8(a) and 8(b) general conditions are not applicable, this Court has opined that certain clarity needs to be given to the issues so as to put any controversy at rest.
11. Shri Atmaram Nadkarni, learned senior counsel appearing for the intervenor(s), submits that in Maharashtra alone 700 projects are pending consideration before SEIAA, which, on account of stay order granted by this Court could not be considered.
12. It is submitted by all the counsel for the respondent(s) that MoEF&CC is not equipped with the machinery to consider the entire projects from all the State/Union Territories in the country and therefore the 2006 notification itself provides for the projects which could be considered by the SEIAA.
13. It is, therefore, submitted that the stay on impugned notification has caused irreparable damage to the developmental activities throughout the country, inasmuch as all the projects stand stalled on account of non-consideration by SEIAA.
14. For considering the rival submissions, it will be appropriate to refer to the particulars of the schedule to the 2006 Notification, which is extracted hereinbelow.
1 (2011) 1 SCC 744
766 [2025] 8 S.C.R.Supreme Court Reports “SCHEDULE
LIST OF PROJECTS OR ACTIVITIES REQUIRING
PRIOR ENVIRONMENTAL CLEARANCE
Project or Activity Category with threshold limit Conditions if any (1)
A B Mining, extraction of natural resources and power generation (for a specified production capacity)
(1) (2) (3) (4) (5)
15. It can thus be seen that the Schedule has five columns. In the first column, serial number of the project or activity is mentioned. In the second column the details of the activity are mentioned. In the third column the projects which are approved by the MoEF&CC are mentioned. In the fourth column, the projects which are approved by the SEIAA are mentioned and the fifth and the last column deals with the conditions, if any, which would be applicable.
16. The projects with which we are concerned in the present lis are at Entry 8 of the Schedule, which reads thus:- Project or Activity Category with threshold limit Conditions if any (1)
A B Mining, extraction of natural resources and power generation (for a specified production capacity)
(1) (2) (3) (4) (5)
8 Building/Construction projects/Area Development projects and Townships 8(a) Building and Construction projects >20000 sq. mtrs and <1,50,000 sq.mtrs. of builtup area# #(built up area for covered construction; in the case of facilities open to the sky, it will be the activity area)
8(b) Townships and Area Development projects Covering an area > 50 ha and or built up area >1,50,000 sq.
mtrs++ ++All projects under item 8(b) shall be appraised as Category B1 [2025] 8 S.C.R. 767Vanashakti v. Union of India
17. If we compare column 5 of Entry 8 to Entry 1(a) which deals with mining of minerals and slurry pipelines (coal lignite and other ores) passing through national parks/sanctuaries/coral reefs/ecologically sensitive areas, Entry 1(c) which deals with river-valley projects, Entry 1(d) which deals with the Thermal Power Plants, Entry 2(a) which deals with Coal washeries, Entry 2(b) which deals with Mineral beneficiation, Entry 3(a) which deals with Metallurgical industries (ferrous & nonferrous), Entry 3(b) which deals with Cement plants, Entry 4(b) which deals with Coke oven plants, Entry 4(d) which deals with Choir-alkali industry, Entry 4(f) which deals with Leather/skin/hide processing industry, Entry 5(d) which deals with manmade fibers manufacturing, Entry 5(e) which deals with petrochemical based processing, Entry 5(f) which deals with synthetic organic chemicals industry, Entry 5(g) which deals with distilleries, Entry 5(h) which deals with integrated paint industry, Entry 5 (i) which deals with pulp & paper industry, Entry 5(j) which deals with sugar industry, Entry 6(b) which deals with isolated storage and handling of hazardous chemicals, Entry 7(c) which deals with industrial estates/parks, complexes/areas, Export Processing Zones (EPZs), Special Economic Zones (SEZs), Biotech parks, leather complexes, Entry 7(d) which deals with common hazardous waste treatment, storage and disposal facilities, Entry 7(e) which deals with ports, harbours, break waters, dredging, Entry 7(f) which deals with highways, Entry 7(g) which deals with Aerial ropeways, Entry 7(h) which deals with common effluent treatment plants, Entry 7(i) which deals with common municipal solid waste management facility, column 5 specifically provides that General Conditions shall apply.
18. It is thus clear that wherever the delegated legislation required the General Conditions should be applied, the notification specifically provided for the same.
19. It can clearly be seen that Entry 8(a) and 8(b) of the Schedule do not provide for applicability of General Conditions, however, they provide for some other conditions as can be seen from the 2025 notification. Project and Activity Category with threshold limit Conditions, if any A B
(1) (2) (3) (4) (5)
Continue reading
Sign in and become a member to continue reading this judgment and every other document in the library.
Members read the full text, download where permitted, and keep notes and bookmarks.