Bindu Kapurea v. Subhashish Panda & Ors.
- Citation
- 2025 INSC 784; [2025] 5 S.C.R. 2764
- Court
- Supreme Court of India
- Bench
- 2 Judges: Justice Surya Kant, Justice N Kotiswar Singh
- Decided
- 28 May 2025
- Case number
- DIARYNO AND DIARYYR No. 21171/2024
- Sections
- 2, 12, 154, 29, 9(3), 3
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:19 am. Original source ↗
Preview: first 50% of the document.
[2025] 5 S.C.R. 2764 : 2025 INSC 784 Bindu Kapurea v.
Subhashish Panda & Ors.
(Contempt Petition (Civil) Diary No. 21171 of 2024 In Writ Petition (Civil) No. 4677 of 1985 With SMC (Crl.) No. 02 of 2024)
28 May 2025 [Surya Kant* and Nongmeikapam Kotiswar Singh, JJ.] Issue for Consideration Whether unauthorised tree felling and construction in the Delhi Ridge Forest without requisite permissions as directed by the Supreme Court in its orders in M.C. Mehta v. Union of India constitute wilful disobedience.
Whether the omission to disclose during a hearing that tree felling had already commenced on an earlier date, while the relevant application remained pending, constitutes wilful disobedience that obstructed the administration of justice.
If the breach by the Respondents is wilful and deliberate, what are the remedial and corrective measures that must be undertaken by them to purge the contempt.
Headnotes† Constitution of India – Art 129 – Contempt of Courts Act, 1971 – Supreme Court is vested with inherent powers to punish contempt – Admitted position that no permission had been granted by the Court for felling of trees in the Delhi Ridge area – Amounting to non-compliance of Court’s order dated 09.05.1996 – Omission to disclose during hearing on 04.03.2024 that tree felling had commenced on 16.02.2024, while the relevant application remained pending – Constitutes wilful disobedience on part of Respondents – Resulting in contempt of Court’s orders – Contempt Petition disposed of with directions.
* Author [2025] 5 S.C.R. 2765Bindu K apurea v. Subhashish Panda & Ors. DDA proposed construction of two approach roads through the ecologically sensitive Southern Ridge and Morphological Ridge (3.6 ha) requiring felling of about 1,051 trees – CEC recommended approval subject to compliance – LG issued Gazette Notification dated 14.02.2024 granting exemption under the Delhi Preservation of Trees Act, 1994 – DDA began felling on 16.02.2024 while I.A. No. 40494/2024 was pending – Petitioner lodged complaint on 24.02.2024 after witnessing large-scale tree cutting – During hearing on 04.03.2024, DDA failed to disclose that tree felling had commenced – Around 1,670 trees ultimately felled without permission:
Held: Non-disclosure and unauthorised felling constitute wilful and deliberate disobedience – Suppression of material facts during judicial proceedings amounts to interference with administration of justice – Conduct falls within ‘criminal contempt’ under Section 2(c), Contempt of Courts Act, 1971. [Paras 11–18] Public Interest – Health Infrastructure and Balance of Equities: Held: While finding clear contempt, Court undertook a proportionality analysis – Observed that contempt power must not be wielded vindictively but in furtherance of justice – Court considered overriding public purpose: CAPFIMS, a premier tertiary-care hospital for paramilitary personnel and veterans, provides life-saving services for forces stationed in remote areas and their families – Wider roads for emergency access were an imperative necessity – However, large-scale ecological harm to Delhi Ridge warranted strict remedial measures – Court held that though contempt was grave, punitive sanction would harm public interest and waste public resources since construction had become fait accompli – Adopted restorative approach: imposed costs, ordered afforestation and ecological restoration under independent supervision, mandated periodic compliance, and directed structural reforms in governance – Case illustrates judicial balancing between environmental protection and critical healthcare infrastructure while preserving the majesty of law. [Paras 19–28, 32, 33] Case Law Cited M.C. Mehta v. Union of India, W.P. (C) No. 4677/1985, Order dated 09.05.1996; T.N. Godavarman Thirumulpad v. Union of India [2024] 1 SCR 1194 : W.P. (C) No. 202/1995 – referred to. 2766 [2025] 5 S.C.R.Supreme Court Reports List of Acts Contempt of Courts Act, 1971; Constitution of India; Forest (Conservation) Act, 1980; Delhi Preservation of Trees Act, 1994; Bharatiya Nagarik Suraksha Sanhita, 2023.
List of Keywords Contempt; Ridge Forest; Tree felling; Environmental governance; Rule of law; Public accountability; Forest clearance; Urban ecology; Compensatory afforestation; Directions to purge; Compensatory afforestation; Public interest; Ecological restoration; Native species; Administrative accountability; Departmental action; Environmental levy; Fait accompli.
Case Arising From CIVIL ORIGINAL/INHERENT/CRIMINAL JURISDICTION:
Contempt Petition (Civil) Diary No. 21171 of 2024 In Writ Petition (Civil) No. 4677 of 1985 From the Judgment and Order dated 09.05.1996 of the Supreme Court of India in W.P (C) No. 4677 of 1985 With SMC (Crl.) No. 2 of 2024 and I.A. No. 98622 of 2024 In Writ Petition (Civil) No. 202 of 1995 Appearances for Parties By Courts Motion.
Advs. for the Petitioner:
Vikas Singh, Maninder Singh, Sr. Advs., Manan Verma, Ms. Manika Tripathy, Ashutosh Kaushik, Gautam Yadav, Atul Kumar, Ms. Sweety Singh, Ms. Archana Kumari, Rahul Pandey, Harsh Kumar, Sudipta Singha Roy, Ashutosh Upadhyay, Ms. Diksha Joshi, Geet Ahuja, Chanchal Kumar Ganguli, M/s. PLR Chambers and Co., Syed Mehdi Imam, T. Harish Kumar, M/s. Mitter & Mitter Co., M/s. Lawyer S Knit & Co.
Advs. for the Respondents:
Tushar Mehta, Solicitor General, Mrs. Aishwarya Bhati, Mrs. Archana Pathak Dave, K. M. Nataraj A.S.Gs., B.K. Satija, Shiv [2025] 5 S.C.R. 2767Bindu K apurea v. Subhashish Panda & Ors. Mangal Sharma, A.A.Gs., Vikas Singh, Maninder Singh, Mrs. Garima Prashad, Aditya Sondhi, Anupam Lal Das, Sanjay Jain, Ms. Dr. Monika Gusain, Mrs. Ruchi Kohli, Sr. Advs., Ms. Manika Tripathy, Ashutosh Kaushik, Mukesh Kumar Maroria, Mayank Pandey, Ms. Misha Kumar, Ms. Shivika Mehra, Ajay Kumar Pandey, Madhav Sinhal, Ms. Arunima Dwivedi, Atul Kumar, Ms. Sweety Singh, Ms. Archana Kuamri, Rahul Pandey, Harsh Kumar, Sudipta Singha Roy, Ashutosh Upadhyay, Mrs. Diksha Joshi, Shrey Kapoor, Ms. Kanishka Mittal, Geet Ahuja, Aman Panwar, Abhinav Kumar, Akash Panwar, Mudit Gupta, Siddhant Buxy, Ms. Anusurya Salwan, Deepak Goel, Ms. Alka Goyal, Archana Preeti Gupta, Ms. Bani Dikshit, Rahul Shyam Bhandari, Ms. G Priyadharshni, Satyam Pathak, Prabhakar Pahepuri, Praveen Swarup, Gurmeet Singh Makker, Gaichangpou Gangmei, Raj Kishor Choudhary, Shuvodeep Roy, Deepayan Dutta, Saurabh Tripathi, Kamal Mohan Gupta, Prashant Kumar, Dharmendra Kumar Sinha, P. Parmeswaran, Ms. Sujata Kurdukar, Mrs. Manik Karanjawala, A. Venayagam Balan, Sudarsh Menon, Ramesh Babu M. R., Vikrant Singh Bais, Shiva Pujan Singh, Ms. Charu Mathur, Ejaz Maqbool, Rajesh, M/S. Corporate Law Group, Lakshmi Raman Singh, Ms. K. V. Bharathi Upadhyaya, Rajiv Mehta, C. L. Sahu, Rishabh Sahu, Ms. Hema Sahu, Rajendra Sahu, Ms. Sumita Hazarika, Ms. Abha R. Sharma, Abhishek Chaudhary, B V Deepak, T. N. Singh, T. V. George, Krishnanand Pandeya, Neeraj Shekhar, Ms. Asha Gopalan Nair, Rajesh Singh, Hitesh Kumar Sharma, Amit Kumar Chawla, Akhileshwar Jha, Varun Varma, Chaman Sharma, Rakesh Vishan, Ms. Swati Vishan, Javed Raza, Shiva Nanad Sharma, Narendra Pal Sharma, Ishank Ranjan, Shubham Rajhans, Prakhar Shukla, Ms. Niharika Dwivedi, Ms. Charanjeet Sidhu, Abhisek Sharma, Mrs. Rekha Pandey, Gopal Singh, Punit Dutt Tyagi, Rathin Das, Ratan Kumar Choudhuri, Sudhir Kulshreshtha, Himanshu Shekhar, Ms. Hemantika Wahi, Mohd. Irshad Hanif, Sudhir Kumar Gupta, A. N. Arora, Irshad Ahmad, G. Prakash, E. M. S. Anam, Ms. Sushma Suri, P. V. Yogeswaran, Jitendra Mohan Sharma, Ms. Malini Poduval, Ms. C. K. Sucharita, Ms. Binu Tamta, Mrs. Bina Gupta, K. L. Janjani, Naresh K. Sharma, Ms. A. Sumathi, Jai Prakash Pandey, Mrs. Anjani Aiyagari, Shibashish Misra, Mrs. Rani Chhabra, , Ms. Divya Roy, Tarun Johri, Radha Shyam Jena, Ajit Pudussery, K. V. Vijayakumar, M/s. Parekh & Co., M/S. K J John And Co, V. Balachandran, S. C. Birla, Ram Swarup Sharma, Ashok Mathur, Umesh Bhagwat, Mrs. M. Qamaruddin, H. S. Parihar, Ms. Baby Krishnan, P. R. Ramasesh, T. Mahipal, P. N. 2768 [2025] 5 S.C.R.Supreme Court Reports Gupta, Sarad Kumar Singhania, E. C. Agrawala, Kuldip Singh, Ms. Bina Madhavan, Rakesh K. Sharma, Rajat Joseph, Gopal Prasad, Ms. Jyoti Mendiratta, S.. Udaya Kumar Sagar, Ranjan Mukherjee, Ms. Pratibha Jain, Tejaswi Kumar Pradhan, M/S. Arputham Aruna And Co, Mrs. Nandini Gore, Raj Kumar Mehta, Ms. Madhu Moolchandani, Ms. Sharmila Upadhyay, Rajeev Singh, Mrs. Kanchan Kaur Dhodi, Surya Kant, E. C. Vidya Sagar, M/s. M. V. Kini & Associates, Mrs. B. Sunita Rao, M. Yogesh Kanna, Vikash Singh, P. S. Sudheer, Sunny Choudhary, Siddhartha Jha, M/s. V. Maheshwari & Co., N. Naveen, K. Nagan Pillai, Mayank Aggarwal, Sanjeev Kumar, , Shovan Mishra, Ms. Bipasa Tripathy, Ashutosh Kumar Sharma, Ms. Suman Kukrety, Naveen Kumar, P. K. Manohar, Vinod Sharma, Ms. Surbhi Mehta, Rajeev Singh, Ms. Parul Shukla, Abhishek Pandey, Prashant Kumar Umrao, Arun K. Sinha, Ms. Sakshi Kakkar, B. K. Pal, James P. Thomas, S. Gowthaman, A. Karthik, Rajiv Kumar Choudhry, Anurag Tandon, Rahul Khurana, Akshay Amritanshu, Hariom Yaduvanshi, Arjun Yaduvanshi, Ms. S. Harini, Avi Dhankhar, Vansmani Tripathi, Ms. Aahana Jaiswal, Ms. Drishti Rawal, Ms. Pragya Upadhyay, Ms. Drishti Saraf, Omanakuttan K. K., Ajit Sharma, Ms. Shalini Kaul, Sunil Kumar Sharma, Ms. Swati Ghildiyal, Ms. Neha Singh, Siddharth Sharma, Raj Bahadur Yadav, Uday Prakash Yadav, Raghav Sharma, Sughosh Subramanium, Ms. Ruchi Kohli, Ms. Suhasini Sen, Samir Ali Khan, Sachin Patil, Shubhranshu Padhi, Nishe Rajen Shonker, Nishit Agrawal, Krishna Ballabh Thakur, Ms. Aruna Gupta, Ms. K. Enatoli Sema, Amit Kumar Singh, Ms. Chubalemla Chang, Prang Newmai, Shishir Deshpande, Yusuf, Mrs. Pragya Baghel, Ms. Deepanwita Priyanka, Raghvendra Kumar, Sravan Kumar Karanam, Anant Mann, Lakshmeesh S. Kamath, Gopal Balwant Sathe, Sarvam Ritam Khare, Kushagra Sharma, Anuj Agarwal, Akarsh Khare, Shyam Gopal, Ms. Suhasini Sen, Raghav Sharma, Ms. Ruchi Kohli, Harish Pandey, Ms. Indira Bhakar, Anuj Srinivas Udupa, Krishna Kant Dubey, Piyush Beriwal, Neeraj Kumar Sharma, Ms. Mrinal Elker Mazumdar, Shashwat Parihar, Mukesh K Verma, Vinayak Sharma, Raman Yadav, Shreekant Neelappa Terdal, Ms. Sunieta Ojha, Dinesh Chandra Pandey, Saurabh Rajpal, Himinder Lal, Ms. Shruti Jose, Kaushik Choudhury, Aravindh S., Aman Gautam, Mrs. Kirti Renu Mishra, Atul Sharma, Anirudh Sanganeria, Chinmay Deshpande, Shrey Kapoor , Ms. Anne Mathew, Yash S. Vijay, Abhishek Atrey, Ms. Mrinal Gopal Elker, Chinmoy Chaitanya, Dhaval Mehrotra, Binay Kumar Das, Ms. Lakshmi N. Kaimal, Subhasish Mohanty, Rahul [2025] 5 S.C.R. 2769Bindu K apurea v. Subhashish Panda & Ors. Jain, Sabarish Subramanian, Naveen Kumar, V. N. Raghupathy, M/s. D.s.k. Legal, Ms. Shibani Ghosh, Chandra Bhushan Prasad, Saurabh Rajpal, Amogh Bansal, Ms. Nidhi Jaswal, Ms. Pallavi Langar, Rajeev Kumar Dubey, Rajeev Maheshwaranand Roy, , M/s. Cyril Amarchand Mangaldas Aor, Ms. Nidhi Jaswal, Sandeep Kumar Jha, Milind Kumar, Mohit Paul, Ms. Rashmi Nandakumar, Ms. Manika Tripathy, Ashutosh Kaushik, Akash Mahor, Ms. Ankita Sharma, Ms. Supreeta Sharanagouda, Ms. Ranu Purohit, Ms. Adarsh Nain, Guntur Pramod Kumar, Amrish Kumar, Ms. Purnima Krishna, Mukesh Kumar Maroria, Raghav Sharma, Jagdish Chandra Solanki, Suhasini Sen, Gaurang Bhushan, Dr. Surender Singh Hooda, Sunil Kumar Verma, Prakash Kumar Singh, Ms. Tanya Srivastava, Ms. Seita Vaidyalingam, Anando Mukherjee, Ms. Anzu. K. Varkey, Ms. Astha Sharma, T. R. B. Sivakumar, Sujit Kumar Mishra , Aldanish Rein, Kunal Mimani, Shantanu Kumar, Nishanth Patil, M/s. Venkat Palwai Law Associates, Ajay Marwah, Ravindra S. Garia, Karan Sharma, Ms. Sugandha Anand, Avijit Mani Tripathi, T.K. Nayak, Deeptakirti Verma, Ms. Usha Nandini V., Ms. Vanshaja Shukla, Chirag M. Shroff, Ms. Mayuri Raghuvanshi, Vivek Jain, Sudeep Kumar, Ms. Manisha, Ms. Rani Mishra, Pukhrambam Ramesh Kumar, Venkata Raghuvamsy D., Ms. Swathi H. Prasad, Kamlendra Mishra, Somesh Chandra Jha, Ms. Ruchira Goel, Siddharth Dharmadhikari, Aaditya Aniruddha Pande, Bharat Bagla, Sourav Singh, Aditya Krishna, Adarsh Dubey, Parth Awasthi, Pashupathi Nath Razdan, Tarun Gupta, Sameer Abhyankar, Rahul Kumar, Aakash Thakur, Ms. Ranjeeta Rohatgi, Shubham Upadhyay. Applicant-in-person.
Judgment / Order of the Supreme Court Judgment Surya Kant, J.
1. The instant petition has been filed invoking Article 129 of the Constitution of India, Section 12 of the Contempt of Courts Act, 1971, and Rule 3(c) of the Rules to Regulate Proceedings for Contempt of the Supreme Court, 1975. It prays for the initiation of contempt proceedings against the Respondents for wilful disobedience of this Court’s order dated 09.05.1996 passed in W.P. (C) No. 4677/1985, titled MC Mehta v. Union of India & Others.
2770 [2025] 5 S.C.R.Supreme Court Reports
2. These proceedings arise from a decades-long saga that is associated with a series of writ petitions, wherein this Court has consistently endeavoured to mitigate further environmental degradation in the National Capital Territory of Delhi and across the country. A. FActs
3. At this juncture, it becomes imperative to set out the sequence of events from the outset, in order to provide a comprehensive understanding of the developments that have culminated into the present proceedings.
A.1. Brief background of the cases giving rise to the present controversy
3.1. MC Mehta (supra) is an ongoing matter comprising petitions through which this Court has pronounced several landmark judgments giving new dimensions to environmental jurisprudence, with the specific objective of regulating land use and shutting down of hazardous industries to protect the environment. The said Writ Petition was initially instituted on 16.04.1985 in public interest, to bring to light the grave and escalating pollution of the river Ganga, caused by the indiscriminate discharge of vast quantities of sewage from the city of Kanpur, Uttar Pradesh. It thereafter metamorphosed into a case through which this Court routinely addressed various threats posed to the environment and ecological biodiversity.
3.2. The Delhi Development Authority (DDA) notified the Master Plan for Delhi Perspective 2001 on 05.08.1990 (Delhi Master Plan), wherein it was expressly provided that no further encroachment or infringement upon the Delhi Ridge would be permitted, and that the Ridge would be preserved and maintained in its pristine condition. To explicate, the Delhi Ridge constitutes a natural rock formation, forming a part of the ancient Aravalli hill range. It encompasses approximately 7,777 hectares of forest land and extends over a stretch of nearly 35 kilometres—commencing from the Bhatti Mines area in the southeast, traversing through Tughlaqabad, and tapering towards the northern periphery of the city at Wazirabad. Commonly referred to as the ‘Lungs of Delhi’, the Ridge plays a vital ecological role and forms part of [2025] 5 S.C.R. 2771Bindu K apurea v. Subhashish Panda & Ors. one of the oldest geological formations on the planet, with its origins dating back to the Proterozoic era.
3.3. The Delhi Master Plan accordingly recognised that, in light of the pressures exerted by rapid urbanisation over the years, the Delhi Ridge Area had been subjected to significant threats and adverse environmental impacts. In response, the Master Plan mandated that the Ridge Area be clearly identified and conserved with the utmost care, taking into consideration its critical role as a natural buffer against escalating pollution levels in the National Capital Territory. It further stipulated that afforestation efforts within the Delhi Ridge must prioritise the use of indigenous species, with minimal reliance on artificial landscaping, in order to preserve the ecological integrity and natural character of the forest.
3.4. Commensurately, in M.C. Mehta (supra), this Court issued a series of directions for the conservation and protection of the Delhi Ridge. Pursuant thereto, the then Lieutenant Governor of Delhi issued an order dated 06.10.1995, constituting a dedicated body, known as the Ridge Management Board (RMB), which was entrusted with the responsibility of protecting and restoring the Delhi Ridge Forest. The RMB was established under the Chairmanship of the Chief Secretary of Delhi and was assigned various functions, including the implementation of the management scheme for the Ridge forests, protection and demarcation of its boundaries, and the preparation and execution of detailed plans for the ecological upgradation and long-term preservation of the Ridge area.
3.5. In furtherance of the aforementioned directions, this Court, vide orders dated 25.01.1996 and 13.03.1996, directed that regardless of the mandate contained in Section 154 (vii) of the Delhi Land Reforms Act, 1954, the uncultivated surplus land of the Gaon Sabha falling within the Delhi Ridge shall not vest in the Gaon Sabha, and shall instead be used for the creation of a Reserved Forest. In compliance with the said directions, the Government of the National Capital Territory of Delhi (GNCTD) issued a notification dated 02.04.1996, declaring 10,517 acres of uncultivated Gaon Sabha land, as surplus and placed it at the disposal of the Forest Department. This area now forms 2772 [2025] 5 S.C.R.Supreme Court Reports a part of the aforementioned 7,777 hectares of the Notified Ridge Area.
3.6. To this end, this Court also passed the order dated 09.05.1996, which the Petitioner herein alleges has been violated by the Respondents. The order reads as follows:
“The provisions of the Master Plan makes it mandatory that the Ridge is to be kept free from encroachers and its pristine glory must be maintained for all times. It is a pity that neither the Central Government nor the N.C.T., Delhi Administration has ever applied its mind towards maintaining the Ridge and River Yamuna, which is necessary to maintain the ecological balance of the city. We are of the view that no cut off date can come in the way of relocating the J.J. dwellers which are encroaching on the Ridge. The directions given by this Court in the order dated April 9, 1996 shall have to be complied with. We have already directed in the said order that all encroachers must be shifted from the Ridge before October 31, 1996.
Mr. Khanduri, present in Court, has very fairly stated that the work of relocation of J.J. dwellers from Ridge has already been undertaken on war footing. We have no doubt that the Union of India shall render all assistance to the N.C.T., Delhi Administration in clearing the Ridge area. The next progress report be filed in July, 1996.”
3.7. It may be seen from the contents of the aforesaid order that this Court reiterated the exigency of protecting the Delhi Ridge and ensuring that it remains free from encroachment, so as to preserve its pristine condition. In doing so, the Court referred to the statutory Delhi Master Plan, which unequivocally proscribed any infringement upon the Ridge and mandated its continuous protection and maintenance. The Court further observed that neither the Central Government nor the GNCTD had, until then, adequately addressed the imperative of maintaining the Delhi Ridge and the River Yamuna—both of which were essential to preserving the ecological balance of the city. Accordingly, the Court issued stringent directions to the concerned authorities to [2025] 5 S.C.R. 2773Bindu K apurea v. Subhashish Panda & Ors. ensure the removal of all encroachments from the Ridge area on or before 31.10.1996.
3.8. Parallelly, a public interest litigation, being W.P. (C) No. 202/1995, titled T.N. Godavarman Thirumulpad v. Union of India, had been instituted before this Court on 18.02.1995. The proceedings had initially arisen out of concerns regarding largescale deforestation, illegal logging, and unsustainable practices affecting forest lands in the Nilgiris region. Over time, this case also came to be regarded as one of the most significant judicial interventions in the realm of forest preservation, environmental governance and conservation of natural resources in India through the innovative interpretation and application of the Forest Conservation Act, 1980 (FCA 1980). We find it necessary to highlight this matter, as the directions issued therein in relation to the Delhi Ridge subsequently intersect with the issues raised in the instant Contempt Petition.
3.9. Thereafter, in congruence with the directions put forth in M.C. Mehta (supra), this Court in the T.N. Godavarman (supra) constituted the Central Empowered Committee (CEC) on 09.05.2002, tasked with monitoring the implementation of its orders in respect of removal of encroachments in ecologically sensitive areas, implementation of working plans, compensatory afforestation, plantations and other conservation issues. This Court, in both of these cases, thus sought to continuously monitor initiatives geared towards the protection and conservation of the environment in the country, and also, specifically, the Delhi Ridge.
3.10. Thus, to recapitulate, the forested expanse known as the Delhi Ridge continues to enjoy the protection of this Court, as reaffirmed in MC Mehta (supra) by the order dated 09.05.1996. In tandem with the establishment of the CEC in T.N. Godavarman (supra), it stands settled that any construction or developmental activity within the Delhi Ridge must receive prior approval from the RMB and thereafter from this Court, for which a proposal is to be mooted through the CEC. A.2 Events leading to the filing of the Contempt Petition
3.11. In this backdrop, the Principal Chief Conservator of Forests, Delhi, cum Member Secretary of the RMB vide letter dated 2774 [2025] 5 S.C.R.Supreme Court Reports 21.09.2023, forwarded the Board’s recommendation to the CEC. This communication pertained to an application submitted by the DDA seeking approval for the construction of approach roads connecting the main Chattarpur Road to SAARC University, the Central Armed Police Forces Institute of Medical Sciences (CAPFIMS), and other establishments located in Maidangarhi, including the areas of Sayurpur and Satbari—all of which fall within the ecologically sensitive Southern Ridge region.
3.12. According to the DDA, the area in question had witnessed the emergence of several large-scale residential and institutional developments, including the SAARC University; housing for officials of the Central Bureau of Investigation (CBI), Delhi Police, and the National Investigation Agency (NIA); as well as CAPFIMS. Despite the scale and significance of these developments, the region was reportedly beset with inadequate access infrastructure. The DDA accordingly proposed specific alignments and upgradations traversing notified forest land within the Delhi Ridge, with the stated objective of facilitating seamless access to the residential and institutional establishments referred to above.
3.13. Given the impending interventions into ecologically sensitive areas, the DDA, through the aforementioned application, sought permission to construct two approach roads—namely, the ‘Gaushala Road’ connecting Chattarpur Road to SAARC University and the ‘SAARC University–CAPFIMS Road’. The DDA proposed to utilise 3.60 hectares of the ecologically sensitive Southern Ridge and an additional 0.968 hectares of Morphological Ridge land for the alignment, construction, and widening of these roads, spanning a total length of 2.72 kilometres, which entailed the felling of approximately 1,051 trees. To clarify, Morphological Ridge land refers to areas that, while lying outside the officially notified boundaries of the Delhi Ridge, exhibit geological and ecological features characteristic of the Ridge itself. Owing to their environmental significance, such lands are accorded the same level of protection as the notified Ridge areas, and any activity thereon is subject to the same regulatory safeguards and judicial supervision.
[2025] 5 S.C.R. 2775Bindu K apurea v. Subhashish Panda & Ors.
3.14. Thereupon, the CEC, after due consideration of the DDA’s application, approved such proposal and submitted Report No. 36/2023 dated 06.12.2023, containing its detailed observations and recommendations. In arriving at its conclusions, the CEC took into account, inter alia, the following considerations: i. That the proposed project is in public interest, and the extent of forest land sought to be utilised for the road development represents the bare minimum required;
ii. That the existing seven-metre-wide road is already in use and necessitates upgradation to a four-lane divided configuration with footpaths on either side to facilitate access to institutions of national significance being developed in the vicinity;
iii. That a portion of the forest land proposed for the project is already in use by commuters;
iv. That all requisite statutory clearances are to be obtained by the user agency/DDA under the FCA 1980 for the diversion of 3.60 hectares of forest land for non-forest purposes, along with necessary approvals from the Standing Committee of the National Board for Wild Life (SCNBWL) under the Wildlife (Protection) Act, 1972 for areas falling within the eco-sensitive zone;
v. That the user agency/DDA shall bear the cost of planting and maintaining 2,960 saplings—ten times the number of trees (296) proposed to be cut or transplanted from non-forest land;
vi. That the DDA has expressed its willingness to make available suitable land for undertaking such compensatory plantation; and vii. That the DDA has already earmarked 3.68 hectares of non-forest land at Sector 29, Dwarka, Delhi, to be transferred to the Forest Department in lieu of the 3.60 hectares of forest land proposed to be diverted.
3.15. The CEC finally concluded as follows:
“It is recommended that this Hon’ble Court may consider granting approval to the Applicant, Delhi Development 2776 [2025] 5 S.C.R.Supreme Court Reports Authority for construction of the approach road from Chattarpur Main Road to SAARC University (1.070 kms)
and SAARC University to CAPFIMS (1.650 kms) subject to the following conditions:
i. the user-agency shall deposit 5% of the project cost, proportionate to the area falling within the ridge area, with the Ridge Management Board Fund and which fund under the close supervision of the Ridge Management Board shall be used for protection of the Delhi Ridge by the Forest Department of Delhi Government;
ii. the user-agency shall obtain prior clearance under Forest (Conservation) Act 1980 in respect of the forest land being diverted for construction of the road and abide by all the conditions of forest clearance including payment of NPV and cost of compensatory afforestation;
iii. the user-agency shall obtain necessary approval from the Standing Committee of the National Board for Wildlife in respect of the project land falling within the eco-sensitive zone of Asola Bhati Wildlife Sanctuary;
iv. the user-agency before felling/removal of 296 trees shall obtain necessary permission under the provisions of Delhi Preservation of Tree Act, 1994;
v. the user-agency shall deposit the cost of planting and maintenance of 2960 indigenous plants with the Forest Department, Government of Delhi and make available suitable land for compensatory planting before the permission for felling is granted under the provisions of Delhi Preservation of Tree Act 1994;
vi. the Forest Department, Government of NCT Delhi will undertake the planting of 2960 saplings of the indigenous species at the site to be made available by DDA for the purpose; and [2025] 5 S.C.R. 2777Bindu K apurea v. Subhashish Panda & Ors. vii. Forest Department will raise compensatory planting over 3.68 ha. of non forest land at Sector-29, Dwarka, Delhi in lieu of the 3.60 ha. of forest land proposed to be diverted for non forest use.”
3.16. As matters stood thus, a Gazette Notification dated 14.02.2024 was issued, wherein the Lieutenant Governor of Delhi (LG), exercising powers conferred under Section 29 of the Delhi Preservation of Trees Act, 1994 (1994 Act), granted an exemption in terms of Section 9(3) of the said Act—in public interest—for an area measuring 4.9955 hectares to facilitate the construction of approach roads from Chattarpur to SAARC University, CAPFIMS, and other adjoining establishments. The notification stipulated an advance deposit of ₹2,40,54,000/- by the DDA towards a security amount earmarked for the creation and maintenance of compensatory plantation. Furthermore, it laid down a series of binding conditions upon the DDA to be fulfilled: prior to undertaking the felling or transplantation of trees, during the execution of such activities, and thereafter for the purpose of assessing the success of the plantation efforts. The release of the aforementioned security deposit by the Tree Officer/Deputy Conservator of Forests was made contingent upon the satisfactory fulfilment of these stipulated conditions.
3.17. On 15.02.2024, the DDA moved I.A. No. 40494/2024 in MC Mehta (supra), seeking this Court’s permission for the felling and translocation of 1,051 trees in connection with the construction of the proposed approach roads. In the interim, the Petitioner came to learn of tree-felling activities underway in the Satbari area of South Delhi on 23.02.2024. They visited the site on 24.02.2024 and allegedly observed that a substantial portion of the Ridge Forest had been decimated, with heavy machinery actively engaged in levelling the land. Disturbed by the scale and apparent brazenness of the activity, the Petitioner then contacted the Green Helpline of the Department of Forests and Wildlife, GNCTD, to register a complaint. They however, received a telephonic response on 25.02.2024 from a Forest Guard, who informed them that the ongoing tree cutting was being carried out pursuant to due authorisation, having been permitted by the LG vide the Gazette Notification dated 14.02.2024.
2778 [2025] 5 S.C.R.Supreme Court Reports
3.18. It is pertinent to highlight that the aforesaid IAs preferred by the DDA were dismissed by this Court on the grounds of vagueness vide its order dated 04.03.2024. The Court underscored that the DDA, being an instrumentality of the State, bore a heightened responsibility to prioritise environmental protection and was expected to explore all viable alternatives before resorting to the felling of trees, limiting such action strictly to those instances where it was absolutely unavoidable. The Court further noted that no prior permission had been sought under the FCA 1980.
Consequently, the DDA was directed to revisit its proposal by engaging the services of qualified experts and ensuring that the revised exercise would be conducted in a manner that minimised tree felling to the greatest extent possible. Only upon undertaking these corrective steps was the DDA permitted to file a fresh application seeking the same relief.
3.19. The Petitioner has alleged that the DDA failed to disclose to this Court, during the hearing on 04.03.2024, that the area for which it had sought permission to fell trees had, in fact, already been cleared. It is the Petitioner’s case that the DDA, without awaiting the Court’s adjudication on its applications and in the absence of any express permission, proceeded with the clearing of the Ridge reserved forest as well as the felling of trees on non-forest land to facilitate construction of the approach roads. In view of the above, the Petitioner has preferred the instant Contempt Petition, asserting that such actions on the part of the First Respondent constitute a wilful and deliberate violation of this Court’s binding order dated 09.05.1996 passed in MC Mehta (supra). The Petitioner has accordingly prayed for the initiation of contempt proceedings against the Vice Chairman of DDA/First Respondent.
A.3 A.3 Events subsequent to initiation of Contempt Proceedings
3.20. In addition to the events averred in the Contempt Petition, it will be appropriate to bring the subsequent developments of material significance that merit due consideration. The instant Contempt Petition came up for hearing on 09.05.2024, when notice was issued, the First Respondent was directed to [2025] 5 S.C.R. 2779Bindu K apurea v. Subhashish Panda & Ors. maintain status quo and refrain from carrying out any further felling of trees.
3.21. On the following date of hearing, i.e., 16.05.2024, this Court took cognisance of the averments made in the affidavit filed by the First Respondent and deemed it appropriate to issue suo motu notice of criminal contempt, registered as SMC (Crl.) No. 2/2024. That affidavit revealed that a substantial number of trees had been felled without obtaining the requisite permissions from the prescribed authorities, besides the blatant contravention of this Court’s binding orders. This Court, therefore, expressed grave concern, observing that the DDA’s actions of unauthorised felling of more than 1100 trees constituted a shocking disregard for the Rule of Law and amounted to interference with the administration of justice.
3.22. This Court thereafter proceeded to pass a series of consequential orders, namely: (i) the First Respondent was directed to produce the document evidencing the approval of the LG and to furnish the names of all officers responsible for the breach of this Court’s orders; (ii) the First Respondent was mandated to personally address a letter to the LG disclosing that, while the proposal for approval was forwarded to him, the material fact that the trees had already been felled was wilfully suppressed; (iii) ordered an inquiry into the conduct of the officers who had entrusted the tree felling to the contractor; (iv) directed the DDA to immediately halt all further activities pertaining to the two approach roads and to deploy appropriate officers to ensure strict compliance; (v) appointed an Independent Agency comprising of three eminent environmentalists (Committee) who were to be duly assisted by officers from the Forest Survey of India (FSI) to assess the number of trees felled, the extent of environmental degradation caused, and to propose suitable species for replantation along with other ecological restoration measures; and (vi) directed the DDA to conduct an internal inquiry into the lapse committed by its Legal Department in failing to brief its counsel correctly on 04.03.2024 regarding the ongoing tree felling. Further, this Court also restrained the RMB from clearing project proposals for the diversion of the Ridge forests without seeking permission from this Court.
2780 [2025] 5 S.C.R.Supreme Court Reports
3.23. In the meantime, the Committee constituted by this Court submitted its preliminary report detailing the number of trees felled and the extent of environmental degradation caused. The report observed that the DDA had failed to offer a satisfactory explanation for the urgency with which the tree felling was undertaken. It cautioned that the absence of tree cover along the road could result in the creation of a heat island and lead to intensified urbanisation of the adjoining areas. The Committee further noted that no transplantation had taken place at the designated site and that, of the 145 trees transplanted at alternate, non-designated locations, nearly half comprised the invasive Subabool species, which ought to be removed. In light of these findings, the Committee recommended both possible outcomes—either the removal of the road to facilitate restorative measures or its completion, should this Court so deem fit.
3.24. Pursuant to the aforesaid directions, the First Respondent also filed an affidavit dated 19.06.2024, tendering an unconditional apology and detailing steps undertaken in compliance. It was submitted that: (i) corrective measures were underway, including disciplinary action against the errant DDA officials and the formulation of Standard Operating Procedures (SOPs) to prevent recurrences; (ii) the First Respondent was on sanctioned medical leave from 16.02.2024 to 02.03.2024, and worked from home until 12.03.2024, during which period he remained unaware of the tree felling and therefore failed to apprise this Court; (iii) an internal Inquiry Committee found the following officials responsible: Executive Engineer Manoj Kumar Yadav (who instructed the contractor to fell the trees), Engineering Division officials Pawan Kumar and Ayush Saraswat (who permitted the felling), and Superintendent Engineer Pankaj Verma (who, along with Yadav, was found to have suppressed material facts from this Court on 04.03.2024);
(iv) all four officers had been suspended and disciplinary proceedings initiated; (v) while prior contractor agreements did not include clauses mandating Court permission for tree felling, all future tenders would expressly incorporate [2025] 5 S.C.R. 2781Bindu K apurea v. Subhashish Panda & Ors. such terms; (vi) work at the site had been fully halted, and approximately 174 trees in non-forest areas and 468 in forest areas were confirmed to have been felled; (vii) the DDA would cooperate fully with the Committee constituted by this Court in implementing all remedial measures; (viii) the Chief Legal Advisor of the DDA had been misinformed by Manoj Kumar Yadav, leading to incorrect submissions before this Court; and
(ix) the DDA had identified 185 acres of land for afforestation and committed to planting 100 trees for every tree felled, in addition to 500 trees along the widened sections of the site to aid ecological restoration.
3.25. This Court, on 24.06.2024, while considering the affidavit of the First Respondent, also examined the Inquiry Committee Report annexed thereto. Particular attention was drawn to three emails allegedly sent by the Executive Engineer instructing the contractor to commence tree felling. These emails purportedly referenced a visit by the LG, in his capacity as Chairperson of the DDA, to the site on 03.02.2024, during which he allegedly directed the clearing of trees. However, upon further questioning, it emerged that there was ambiguity as to whether the Learned LG had actually visited the tree-felling site or only the CAPFIMS campus. In view of this uncertainty, and considering the Executive Engineer’s subsequent claim before the Inquiry Committee that the emails were manipulated, the Court directed the First Respondent to submit a clear and unequivocal statement clarifying whether any such direction had, in fact, been issued by the LG.
Continue reading
Sign in and become a member to continue reading this judgment and every other document in the library.