The State of West Bengal & Ors. v. Pam Developments Private Limited & Anr.
- Citation
- 2025 INSC 69; [2025] 1 S.C.R. 772
- Court
- Supreme Court of India
- Bench
- 2 Judges: Justice Bela M. Trivedi, Justice Satish Chandra Sharma
- Decided
- 9 Jan 2025
- Case number
- CIVIL APPEAL No. 300/2025
- Sections
- 80, 12
Not a certified copy. Text extracted from the judgment PDF published by the Supreme Court of India. Verify against the certified copy before relying on it. Source: Supreme Court of India, via the Indian Supreme Court Judgments dataset by Dattam Labs (CC-BY-4.0). Retrieved 17 Nov 2026, 12:21 am. Original source ↗
Preview: first 50% of the document.
[2025] 1 S.C.R. 772 : 2025 INSC 69 The State of West Bengal & Ors.
v.
PAM Developments Private Limited & Anr.
(Civil Appeal No. 300 of 2025)
09 January 2025 [Bela M. Trivedi and Satish Chandra Sharma,* JJ.] Issue for Consideration Whether an amendment to a plaint introducing a fresh cause of action can be allowed if it arises out of continuous transactions and does not alter the nature and character of the suit; whether the bar under Section 80 of the CPC applies to an amendment application in a pending suit.
Headnotes† Civil Procedure Code, 1908 – Order VI Rule 17 – Amendment of plaint – When permissible – Fresh cause of action – Whether an amendment to a plaint introducing subsequent events can be allowed – Whether the amendment changes the nature and character of the suit – Suit filed challenging debarment orders – Subsequent debarment orders issued – Plaintiff sought amendment to include subsequent debarment orders as a continuous cause of action – High Court allowed the amendment – Supreme Court upheld the decision, holding that the amendments were necessary for complete adjudication of the dispute and did not alter the nature of the suit:
Held: Debarment orders formed a continuous cause of action – Cause of action is continuous when the wrongful act is repeated over time, extending the limitation period – Termination of the agreement, the First Debarment Order, and the memo dated 8th March 2016 constituted the cause of action – The subsequent debarment orders were part of the same event, they did not require a fresh suit – The amendment was valid and necessary for the complete adjudication of the dispute and did not alter the nature of the suit. [Para 24] * Author [2025] 1 S.C.R. 773The State of West B engal & Ors. v.
PAM Developments Private Limited & Anr.
Civil Procedure Code, 1908 – Section 80 – Notice requirement before filing suit against the government – Not applicable to an amendment application:
Held: Where the amendment does not introduce a new cause of action but only supplements the existing one, the requirement under Section 80 does not apply – Amendment permissible even without prior notice to the government. [Para 26] Limitation Act, 1963 – Computation of limitation – Continuous cause of action – When applicable – Respondent sought damages for debarment orders issued over time – High Court found cause of action to be continuous – Supreme Court upheld this view:
Held: Cause of action continued to evolve with successive debarment orders, extending the limitation period. [Para 23] Case Law Cited Bishandayal & Sons v. State of Orissa & Ors. (2001) 1 SCC 555 – relied upon.
List of Acts Code of Civil Procedure, 1908; Limitation Act, 1963.
List of Keywords Amendment of plaint; Fresh cause of action; Continuous cause of action; Debarment; Limitation; Maintainability; Notice under Section 80 CPC; Suit against Government.
Case Arising From CIVIL APPELLATE JURISDICTION: Civil Appeal No. 300 of 2025 From the Judgment and Order dated 08.01.2024 of the High Court at Calcutta in GA No. 11 of 2022 Appearances for Parties Ashok Kumar Panda, Sr. Adv., Chanchal Kumar Ganguli, Advs. for the Appellants.
Sarad Kumar Singhania, Saurav Agarwal, Advs. for the Respondents. 774 [2025] 1 S.C.R.Supreme Court Reports Judgment / Order of the Supreme Court Judgment Satish Chandra Sharma, J.
1. Leave granted.
2. The Appellants challenge order dated 08.01.2024 in G.A. No. 11 of 2022 in C.S. No. 102 of 2016 whereby and whereunder the Ld. Single Judge of the High Court at Calcutta allowed the application filed by the present Respondent/original Applicant seeking amendment of plaint and dispensed with the requirement of issuance of notice under Section 80 of the Code of Civil Procedure, 1908 [hereinafter “CPC”] for incorporating the amendment and prayer by way of amendment in the original plaint.
3. At the outset, it is imperative to take note of the relevant background facts and the chequered litigation history between the parties that are germane to the present dispute.
BACKGROUND
4. Appellant No. 4 / Superintending Engineer, Public Works Department [hereinafter “PWD”], Kolkata floated a tender on 04.12.2013 for the strengthening of the Howrah-Amta Road from 7.90 Km to 11.80 Km [hereinafter “the Project”]. The Respondent emerged as the successful applicant and accordingly, an agreement was entered into by Appellant No. 4 and the Respondent on 23.04.2014, wherein the stipulated date for completion was 19.08.2014. The work was not completed by the stipulated date, and accordingly the Appellant No. 4 extended the timeline for the project while imposing a penalty rate. Ultimately, on 14.05.2015 Respondent’s security deposit came to be forfeited in light of non-completion of work.
5. Vide order dated 07.07.2015, Appellant No. 4 debarred the Respondent from participating in any tender floated by it for the next two years [hereinafter “the First Debarment Order”]. The First Debarment Order was set aside by the High Court at Calcutta1 on the consideration that the Respondent was not put on notice. Consequently, Appellant No. 4 issued a show-cause notice dated 18.09.2015 for debarment 1 WP(C) No. 1043 of 2015 [2025] 1 S.C.R. 775The State of West B engal & Ors. v.
PAM Developments Private Limited & Anr.
to the Respondent and issued a memo dated 08.03.2016, requesting the latter to appear before the Debarment Committee.
6. Aggrieved by memo dated 08.03.2016, Respondent preferred a civil suit, being C.S. No. 102 of 2016 [hereinafter “Civil Suit”], along with an application for an injunction, being G.A. No. 1339/2016, before the High Court at Calcutta. In the Civil Suit, the Respondent challenged the authority of the Appellants in issuing the memo requesting appearance in the debarment proceedings on the ground that the penalty for debarment is outside the scope of the contract in question and dehors the same. The Respondent also relied on the penalty amount imposed by the Appellants for the same cause of action to buttress its position. Further, and more critically, the Respondent claims that it has suffered a loss of around Rs. 2,21,61,296/- on account of the First Order of Debarment, which was wrongfully imposed. The Respondent has made several other claims which are not important to go into in this appeal.
7. The High Court at Calcutta disposed of G.A. No. 1339/2016 while granting liberty to the Respondent to contest all grounds, including that of jurisdiction and composition before the Debarment Committee itself. Thereafter, for the next two years the Committee issued orders dated 01.12.2016, 06.03.2017, 22.05.2017, and finally on 31.10.2017 [hereinafter “Underlying Debarment Order”], debarring the Respondent from participating in any tender floated by it for the next two years. Orders dated 01.12.2016, 06.03.2017, and 22.05.2017, were respectively set aside by the High Court at Calcutta vide orders dated 06.02.2017 2 , 22.03.2017 3 , and 02.08.2017 4 on the ground of procedural lapses on the part of the Appellants in conducting the Debarment proceedings. Finally, against the Underlying Debarment Order, the Respondent preferred G.A. No. 173 of 2018 in C.S. No. 102 of 2016 which came to be rejected vide order dated 24.01.2020, wherein the High Court at Calcutta observed - “It is not for the Court at this stage to speculate on the effect of that debarment already suffered by the plaintiffs on a tender process which is yet to happen. The issue as to whether or not the petitioner was correctly debarred as sought to be done in the present case, is an issue which need not to be decided in this application. Such issue is kept open.” 2 GA No. 84 of 2017 in CS No. 102 of 2016.
3 GA No. 877 of 2017 in CS No. 102 of 2016.
4 GA No. 2416 of 2017 in CS No. 102 of 2016.
776 [2025] 1 S.C.R.Supreme Court Reports
8. At the close of this litigation history, the Respondent filed an application, being G.A. No. 7 of 2019 in C.S. No. 102 of 2016 seeking to amend the plaint in order to bring on record subsequent facts necessary for effective adjudication. While this application was dismissed as “not pressed”, the Respondent filed another application for amendment of the plaint, being G.A. No. 11 of 2022 in C.S. No. 102 of 2016 [hereinafter “the Underlying Application”]. The Respondent prayed to amend the plaint and the prayer on the ground that several facts had taken place after the Civil Suit was filed resulting in a continuous cause of action, whereby it is pertinent to bring those facts on record in order to adjudicate upon the dispute. The Appellants strongly contested the Underlying Application by stating that it is identical to G.A. No. 7 of 2019, i.e. the first amendment application, which was dismissed.
9. Vide order dated 08.01.2024 [hereinafter the “Impugned Order”], the High Court categorically held that the amendment sought for by the Respondent amounts to a continuous cause of action and will not change the nature and character of the Civil Suit. In fact, the memo dated 08.03.2016 forms the subject matter of the Civil Suit between the parties, and is a continuation to the show-cause notice dated 18.09.2015. Further, it noted that the issue of whether the Respondent has been correctly debarred or not by the Appellants has been kept open vide order dated 24.01.2020. Consequently, the impugned order concludes that the entire circumstances are in continuation to the memo dated 08.03.2016.
SUBMISSIONS BY THE PARTIES